A two-phase approach to solve the synchronized bin–forklift scheduling problem

被引:0
作者
Nizar El Hachemi
Mohammed Saddoune
Issmail El Hallaoui
Louis-Martin Rousseau
机构
[1] Université Mohammed V Agdal,Département de génie industriel, École Mohammadia d’Ingénieurs
[2] Université Hassan II,Faculté des Sciences Techniques de Mohammedia
[3] École Polytechnique de Montréal,Département de mathématiques et génie industriel
[4] Université de Montréal,CIRRELT
[5] GERAD,undefined
来源
Journal of Intelligent Manufacturing | 2018年 / 29卷
关键词
Scheduling; Column generation; Mixed-integer programming; Textile industry;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we propose a two-phase approach to solve a combined routing and scheduling problem that occurs in the textile industry: fabrics are dyed by dye-jets and transported by forklifts. The objective is to minimize the cost of the unproductive activities, i.e., the dye-jet setup times and the forklift waiting time. The first phase solves an integer linear program to assign jobs (fabrics) to dye-jets while minimizing the setup cost; we compare an arc-based and a path-based formulation. The second phase uses a mixed-integer linear program for the dye-jet scheduling and both the routing and scheduling of forklifts. Experiments are performed on real data provided by a major multinational company, and larger test problems are randomly generated to assess the algorithm. The tests were conducted using Cplex 12.6.0 and a column generation solver. The numerical results show that our approach is efficient in terms of both solution quality and computational time.
引用
收藏
页码:651 / 657
页数:6
相关论文
共 50 条
  • [31] Applying multi-phase particle swarm optimization to solve bulk cargo port scheduling problem
    Tang, M.
    Gong, D.
    Liu, S.
    Zhang, H.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2016, 11 (04): : 299 - 310
  • [32] Applying an integer Electromagnetism-like algorithm to solve the cellular manufacturing scheduling problem with an integrated approach
    Golmohammadi, A.
    Ghodsi, Reza
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 34 - 39
  • [33] An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem
    Liao, Ching-Jong
    Tjandradjaja, Evi
    Chung, Tsui-Ping
    APPLIED SOFT COMPUTING, 2012, 12 (06) : 1755 - 1764
  • [34] A bicriteria approach to the two-machine flow shop scheduling problem
    Sayin, S
    Karabati, S
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (02) : 435 - 449
  • [35] An effective two phase heuristic for synchronized seru production scheduling and 3PL transportation problems
    Zhang, Zhe
    Gong, Xue
    Song, Xiaoling
    Yin, Yong
    Lev, Benjamin
    Zhou, Xiaoyang
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2024, 268
  • [36] A SINGLE-MACHINE TWO-AGENT SCHEDULING PROBLEM BY GA APPROACH
    Cheng, Shuenn-Ren
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2012, 29 (02)
  • [37] A Two-Phase Hybrid Approach for the Hybrid Flexible Flowshop with Transportation Times
    Armstrong, Eddie
    Garraffa, Michele
    O'Sullivan, Barry
    Simonis, Helmut
    INTEGRATION OF CONSTRAINT PROGRAMMING, ARTIFICIAL INTELLIGENCE, AND OPERATIONS RESEARCH, CPAIOR 2022, 2022, 13292 : 1 - 13
  • [38] A data intensive heuristic approach to the two-stage streaming scheduling problem
    Liang, Wei
    Hu, Chunhua
    Wu, Min
    Jin, Qun
    JOURNAL OF COMPUTER AND SYSTEM SCIENCES, 2017, 89 : 64 - 79
  • [39] A two-phase scheduling strategy for real-time applications with security requirements on heterogeneous clusters
    Zhu, Xiaomin
    Lu, Peizhong
    COMPUTERS & ELECTRICAL ENGINEERING, 2009, 35 (06) : 980 - 993
  • [40] A branch and bound algorithm to solve a two-machine no-wait flowshop scheduling problem with truncated learning function
    Azizi, Vahid
    Hu, Guiping
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (02) : 89 - 95