Assembly line balancing problems with multi-manned stations: a new mathematical formulation and Gantt based heuristic method

被引:0
作者
Talip Kellegöz
机构
[1] Gazi University,Industrial Engineering Department
[2] Engineering Faculty,undefined
来源
Annals of Operations Research | 2017年 / 253卷
关键词
Line balancing; Multi-manned stations; Integer programming; Simulated annealing; Gantt based representation;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses an assembly line balancing problem in which each station is allowed to have more than one worker, with minimization of two objectives: (i) the number of workers used in the line and (ii) the number of stations opened in the line. Each station has an own workpiece, and workers at the same station simultaneously perform different assembly tasks on its workpiece. For solving the balancing problem of these lines, a new mixed integer programming formulation is presented, and then a simulated annealing based heuristic method is proposed. The new formulation requires less number of variables and constraints. The basic property of the proposed heuristic is that it is directly applied to Gantt representations of problem’s solutions. Moreover, the paper includes some important neighborhood generation properties for Gantt representations of solutions. Both methods are compared with existing methods available in the literature. Experimental study indicates that the proposed methods can yield promising results.
引用
收藏
页码:377 / 404
页数:27
相关论文
共 46 条
[1]  
Becker C(2009)Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure European Journal of Operational Research 199 359-374
[2]  
Scholl A(2009)A team-oriented design methodology for mixed model assembly systems Computers and Industrial Engineering 56 576-599
[3]  
Cevikcan E(2010)Simultaneous perspective-based mixed-model assembly line balancing problem Tamkang Journal of Science and Engineering 13 327-336
[4]  
Durmusoglu MB(2006)Assembly line balancing and group working: A heuristic procedure for workers’ groups operating on the same product and workstation Computers and Operations Research 33 2757-2774
[5]  
Unal ME(2011)A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem International Journal of Advanced Manufacturing Technologies 53 363-378
[6]  
Chang H-J(1989)Tabu search—Part I ORSA Journal on Computing 1 190-206
[7]  
Chang T-M(1990)Tabu search—Part II ORSA Journal on Computing 2 4-32
[8]  
Dimitriadis SG(1998)Binary integer formulation for mixed-model assembly line balancing problem Computers and Industrial Engineering 34 451-461
[9]  
Fattahi P(1961)Assembly line balancing using ranked positional weight technique Journal of Industrial Engineering 12 394-398
[10]  
Roshani A(1963)Assembly line balancing with a precedence matrix Management Science 9 551-562