共 15 条
[1]
Baker A. D.(1998)A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull Journal of Manufacturing Systems 17 297-320
[2]
Baker A. D.(1999)Agents and the internet: Infrastructure: Mass customisation IEEE Internet Computing 3 62-69
[3]
Van Dyke Parunak H.(1998)The walrus algorithm Computational Economics 12 1-24
[4]
Erol K.(2003)Formalizing an engineering approach to cooperating knowledge based systems IEEE Transactions on Knowledge and Data Engineering 15 103-117
[5]
Chen J. Q.(1991)Characterising the manufacturing scheduling problem Journal of Manufacturing Systems 10 241-258
[6]
Wellman M. P.(1999)A distributed architecture and negotiation protocol for scheduling in manufacturing systems Computers in Industry 38 103-113
[7]
Deen S. M.(1991)Distributed constrained heuristic search IEEE Transaction on Systems, Man and Cybernetics 21 1446-1461
[8]
Johnson C. A.(2001)Ranking engineering design concepts using a fuzzy outranking preference model Fuzzy Sets and Systems 119 161-170
[9]
Parunak H. V. D.(1993)A market-oriented programming environment and its application to distributed multicommodity flow problems Journal of AI Research, Morgan Kaufmann 1 1-23
[10]
Sousa P.(1994)Preference-based decision making for cooperative knowledge-based systems ACM Transactions on Information Systems 12 407-435