共 50 条
- [44] Tensile and low cycle fatigue behavior of primary pipe material for PWR nuclear power plant EVALUATION, INSPECTION AND MONITORING OF STRUCTURAL INTEGRITY, 2008, : 293 - 298
- [45] DETERMINATION OF PREVENTIVE MAINTENANCE CYCLE FOR AGEING EQUIPMENT IN NUCLEAR POWER PLANT BASED ON ECONOMIC ANALYSIS PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 1, 2014,
- [46] Problems and Experience in Guaranteeing the Nuclear Safety of the Storage of Spent Fuel from Nuclear Power Plants Atomic Energy, 2001, 91 : 801 - 809
- [48] Experience in operating and upgrading the No. 5 unit of the Novovoronezh nuclear power plant – practical base for developing a reliable source of nuclear energy Atomic Energy, 2011, 109 : 321 - 327