Planning a Fuel Run with a Fixed Operating Cycle of a Nuclear Power Plant

被引:0
|
作者
N. N. Oshkanov
机构
[1] Beloyarsk Nuclear Power Plant,
来源
Atomic Energy | 2001年 / 91卷
关键词
Power Plant; Nuclear Power Plant; Operating Cycle; Fixed Operating;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1035 / 1036
页数:1
相关论文
共 50 条
  • [21] NECESSITY OF NUCLEAR FUEL CYCLE CLOSURE
    Muravyov, E. V.
    ATOMIC ENERGY, 2012, 111 (06) : 404 - 412
  • [22] Significance determination on operating event of broken shaft of RCV pump for nuclear power plant
    Zheng, Li-Xin
    Sun, Shu-Hai
    Tao, Shu-Sheng
    Zhang, Jia-Jun
    Jiao, Feng
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2015, 49 (12): : 2189 - 2194
  • [23] Risk Assessment of Test Cycle Change of Important Equipment in Nuclear Power Plant
    Yu, Xipeng
    Dai, Hongwei
    2024 6TH ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM, AEEES 2024, 2024, : 378 - 382
  • [24] Calculation of the Economic Parameters of a Nuclear Power Plant
    O. D. Kazachkovskii
    Atomic Energy, 2001, 90 : 329 - 336
  • [25] Calculation of the economic parameters of a nuclear power plant
    Kazachkovskii, OD
    ATOMIC ENERGY, 2001, 90 (04) : 329 - 336
  • [26] Research on Mobile Emergency Cooling System for Spent Fuel Pool in Nuclear Power Plant
    Wang Z.
    Hu J.
    Peng Y.
    Xie E.
    Wan Q.
    Hedongli Gongcheng/Nuclear Power Engineering, 2023, 44 (06): : 220 - 225
  • [27] A multi-stage hybrid fault diagnosis approach for operating conditions of nuclear power plant
    Wang, Zhichao
    Xia, Hong
    Peng, Binsen
    Yang, Bo
    Zhu, Shaomin
    Zhang, Jiyu
    Annor-Nyarko, M.
    ANNALS OF NUCLEAR ENERGY, 2021, 153
  • [28] Design of Operating Condition Identification Method for Nuclear Power Plant Based on Probabilistic Neural Network
    Wang W.
    Yu L.
    Wang X.
    Hao J.
    Ye L.
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2022, 56 (07): : 1347 - 1355
  • [29] Analysis of criticality in shipment and storage of fuel at a nuclear power plant with a VVÉR reactor
    G. L. Ponomarenko
    Atomic Energy, 1999, 87 : 466 - 471
  • [30] Life Cycle Assessment of the New Generation GT-MHR Nuclear Power Plant
    Koltun, Paul
    Tsykalo, Alfred
    Novozhilov, Vasily
    ENERGIES, 2018, 11 (12)