共 32 条
[1]
Akturk M.S.(1999)An overview of design and operational issues of Kanban systems International Journal of Production Research 37 3859-3882
[2]
Erhun F.(2009)Sequencing mixed-model assembly lines: Survey, classification and model critique European Journal of Operational Research 192 349-373
[3]
Boysen N.(2009)The product rate variation problem and its relevance in real world mixed-model assembly lines European Journal of Operational Research 197 818-824
[4]
Fliedner M.(2002)Mixed model assembly line design in a make-to-order environment Computers & Industrial Engineering 41 405-421
[5]
Scholl A.(2003)Adaptive scheduling in random flexible manufacturing systems subject to machine breakdowns International Journal of Production Research 41 1927-1951
[6]
Boysen N.(2005)A brief survey of just-in-time sequencing for mixed-model systems International Journal of Operations Research 2 38-42
[7]
Fliedner M.(1998)Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis International Journal of Production Research 36 2209-2224
[8]
Scholl A.(2003)Interaction of design and operational parameters in periodic review kanban systems International Journal of Production Research 41 3315-3338
[9]
Bukchin J.(1997)A goal programming approach to mixed-model assembly line balancing problem International Journal of Production Economics 48 177-185
[10]
Dar-El E.M.(1993)Minimizing variation of production rates in just-in-time systems: A survey European Journal of Operational Research 66 259-271