An optimal Kanban system in a multi-stage, mixed-model assembly line

被引:0
作者
Lei Yang
Xiaopeng Zhang
Mingyue Jiang
机构
[1] South China University of Technology,School of Business Administration
来源
Journal of Systems Science and Systems Engineering | 2010年 / 19卷
关键词
Multi-stage; mixed-model assembly line; Kanban management; amount of WIP; one-piece flow;
D O I
暂无
中图分类号
学科分类号
摘要
This paper studies the parameter design and the performance optimization of a Kanban system without stockouts in a multi-stage, mixed-model assembly line. The model of a Kanban system based on production processes is established by examining the relationship among the set-up time, the amount of work in process (WIP), the capacity indicated by a Kanban, and the takt-time ratio. A novel method for optimizing performance on the premise of no stockouts is proposed. Empirical results show that the amount of WIP is reduced remarkably after optimization.
引用
收藏
页码:36 / 49
页数:13
相关论文
共 32 条
[1]  
Akturk M.S.(1999)An overview of design and operational issues of Kanban systems International Journal of Production Research 37 3859-3882
[2]  
Erhun F.(2009)Sequencing mixed-model assembly lines: Survey, classification and model critique European Journal of Operational Research 192 349-373
[3]  
Boysen N.(2009)The product rate variation problem and its relevance in real world mixed-model assembly lines European Journal of Operational Research 197 818-824
[4]  
Fliedner M.(2002)Mixed model assembly line design in a make-to-order environment Computers & Industrial Engineering 41 405-421
[5]  
Scholl A.(2003)Adaptive scheduling in random flexible manufacturing systems subject to machine breakdowns International Journal of Production Research 41 1927-1951
[6]  
Boysen N.(2005)A brief survey of just-in-time sequencing for mixed-model systems International Journal of Operations Research 2 38-42
[7]  
Fliedner M.(1998)Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis International Journal of Production Research 36 2209-2224
[8]  
Scholl A.(2003)Interaction of design and operational parameters in periodic review kanban systems International Journal of Production Research 41 3315-3338
[9]  
Bukchin J.(1997)A goal programming approach to mixed-model assembly line balancing problem International Journal of Production Economics 48 177-185
[10]  
Dar-El E.M.(1993)Minimizing variation of production rates in just-in-time systems: A survey European Journal of Operational Research 66 259-271