Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristics

被引:0
作者
Peng Wu
Junheng Cheng
Feng Chu
机构
[1] Fuzhou University,School of Economics and Management
[2] Fujian Normal Universtiy,School of Economics
[3] University of Paris-Saclay,Laboratory IBISC, Univ Evry
来源
Annals of Operations Research | 2021年 / 296卷
关键词
Energy-conscious batch scheduling; Time-of-use (TOU); Bi-objective optimization; -constraint-based constructive heuristic algorithms;
D O I
暂无
中图分类号
学科分类号
摘要
Time-of-use (TOU) electricity pricing policy is widely encountered in the world, which provides new opportunities for power-intensive enterprises to save their energy cost. A good trade-off between the total electricity cost and production efficiency is desired by decision makers. This work addresses an energy-conscious bi-objective single-machine batch scheduling problem under TOU electricity tariffs, in which electricity price varies with time. The objective of the problem is to simultaneously minimize total electricity cost and makespan. Due to its strong NP-hard nature, two fast new ϵ\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\epsilon $$\end{document}-constraint-based constructive heuristic algorithms are developed to solve it. The core idea is to transform the bi-objective problem into a series of single-objective problems that are fast and heuristically solved to obtain an approximate Pareto front. Especially, for each transformed single-objective problem, two novel constructive heuristic algorithms are proposed by solving a series of multiple knapsack problems and 0–1 knapsack problems, respectively. Computational results on 145 benchmark and 80 newly generated larger-scale instances show that the proposed algorithms are quite efficient and are able to find high-quality Pareto solutions for large-scale problems with up to 200 batches.
引用
收藏
页码:471 / 494
页数:23
相关论文
共 166 条
[1]  
Che A(2015)Robust optimization for the cyclic hoist scheduling problem European Journal of Operational Research 240 627-636
[2]  
Feng J(2016)An efficient greedy insertion heuristic for energy-conscious single machine scheduling problem under time-of-use electricity tariffs Journal of Cleaner Production 129 565-577
[3]  
Chen H(2017)Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs Journal of Cleaner Production 156 688-697
[4]  
Chu C(2017)Bi-objective optimization for multi-floor facility layout problem with fixed inner configuration and room adjacency constraints Computers & Industrial Engineering 105 265-276
[5]  
Che A(2016)Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices RAIRO-Operations Research 50 715-732
[6]  
Zeng Y(2017)Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs Computers & Industrial Engineering 112 721-734
[7]  
Lyu K(2018)An improved model for parallel machine scheduling under time-of-use electricity price IEEE Transactions on Automation Science and Engineering 15 896-899
[8]  
Che A(2019)A modified descent method-based heuristic for binary quadratic knapsack problems with conflict graphs Annals of Operations Research 232 464-478
[9]  
Zhang S(2014)The bi-objective pollution-routing problem European Journal of Operational Research 13 1138-1154
[10]  
Wu X(2016)Parallel machine scheduling under time-of-use electricity prices: New models and optimization approaches IEEE Transactions on Automation Science and Engineering 238 199-227