An enhanced estimation of distribution algorithm for solving hybrid flow-shop scheduling problem with identical parallel machines

被引:3
作者
Sheng-yao Wang
Ling Wang
Min Liu
Ye Xu
机构
[1] Tsinghua University,Tsinghua National Laboratory for Information Science and Technology (TNList), Department of Automation
来源
The International Journal of Advanced Manufacturing Technology | 2013年 / 68卷
关键词
Hybrid flow-shop scheduling; Identical parallel machine; Decoding method; Estimation of distribution algorithm; Probability model;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, an enhanced estimation of distribution algorithm (EEDA) is proposed to solve the hybrid flow-shop scheduling problem with identical parallel machines to minimize makespan. To evaluate the individuals, some decoding rules including the improved permutation scheduling rule, the improved list scheduling rule and the backward scheduling rule are designed for the permutation-based encoding scheme, and then a hybrid decoding method is proposed. To describe the distribution of the solution space for the EEDA, a probability model is built and used to generate new individuals by sampling. To well trace the region with promising solutions, a mechanism is provided to update the model with the superior sub-population. To enhance the exploitation capability, multiple local search operators are incorporated in the framework of the EEDA. The influence of the parameter setting is investigated based on the Taguchi method of design-of-experiment. Extensive numerical testing results based on sets of the well-known benchmarks and the comparisons with some existing algorithms demonstrate the effectiveness of the proposed algorithm.
引用
收藏
页码:2043 / 2056
页数:13
相关论文
共 105 条
[1]  
Wang L(2012)A novel decoding method for the hybrid flow-shop scheduling problem with multiprocessor tasks Int J Adv Manuf Technol 59 1113-1125
[2]  
Xu Y(2012)Bi-objective hybrid flow shop scheduling with sequence-dependent setup times and limited buffers Int J Adv Manuf Technol 58 309-325
[3]  
Zhou G(2012)Solving a new mathematical model for a hybrid flow shop scheduling problem with a processor assignment by a genetic algorithm Int J Adv Manuf Technol 61 339-349
[4]  
Wang SY(2012)An immune algorithm for hybrid flow shop scheduling problem with time lags and sequence dependent setup times Int J Adv Manuf Technol 63 337-348
[5]  
Liu M(2011)An efficient bi-objective heuristic for scheduling of hybrid flow shops Int J Adv Manuf Technol 54 287-307
[6]  
Hakimzadeh Abyaneh S(2009)Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns Int J Adv Manuf Technol 42 189-201
[7]  
Zandieh M(2010)The hybrid flow shop scheduling problem Eur J Oper Res 205 1-18
[8]  
Ziaeifar A(2010)Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective Comput Oper Res 37 1439-1454
[9]  
Tavakkoli-Moghaddam R(1988)Two-stage hybrid flow shop scheduling problem J Oper Res Soc 39 359-364
[10]  
Pichka K(1998)Branch and bound crossed with GA to solve hybrid flowshops Eur J Oper Res 107 389-400