Operational Optimisation of Pilot Scale Biological Nutrient Removal at the Ciudad Real (Spain) Domestic Wastewater Treatment Plant

被引:0
作者
Lourdes Rodríguez Mayor
José Villaseñor Camacho
Francisco J. Fernández Morales
机构
[1] University of Castilla-La Mancha,Department of Chemical Engineering
[2] Ciudad Real,Department of Chemical Engineering
[3] University of Castilla-La Mancha,undefined
[4] Ciudad Real,undefined
来源
Water, Air, and Soil Pollution | 2004年 / 152卷
关键词
activated sludge; biological nutrient removal; optimisation; variables study; VIP process;
D O I
暂无
中图分类号
学科分类号
摘要
The aim of this work is optimising operating conditions for a possibleimplementation of a Biological Nutrient Removal (BNR) process in the Wastewater Treatment Plant (WWTP) of Ciudad Real (Spain). Several factors (hydraulic retention times, anaerobic nitrate concentration, sludge age and wastewater biodegradability) were tested using a pilot scale VIP (Virginia Initiative Plant) activated sludge process and domestic wastewater from the full scale plant. Hydraulic retention times used did not cause changes in N and P removal. P removal was adversely affected by anaerobic NO3- and improved with higher BOD5/COD ratios in wastewater. Influence of sludge age was very low in P removal, but N removal was mainly affected by this factor. Final operating conditions were selected taking into account their effects over one of both nutrients. COD and SS removal were always successful. N removal was also easily reached and the main difficulty was P removal. P sludge content was very low (2.5–4%) approximately and was also affected by the same factors tested. The main factor to improve P removal was supposed to be the organic wastewater composition. Wastewater characteristics were modified by using different sources from the WWTP. Volatile fatty acids (VFA) addition to the wastewater by using supernatant of the anaerobic sludge digesters seemed to be the best practical solution for a future BNR implementation in the WWTP.
引用
收藏
页码:279 / 296
页数:17
相关论文
共 105 条
[1]  
Abu-gararah Z. H.(1991)The effect of organics compounds on biological phosphorus removal Water Sci. Technol. 23 585-594
[2]  
Randall C. W.(1998)Upgrading anaerobic/ aerobic wastewater treatment plant Water Sci. Technol. 37 243-350
[3]  
Austermann U.(1997)General model for biological nutrient removal activated-sludge systems: Model presentation Water Environ. Res. 69 969-984
[4]  
Lange R.(1974)Cut P and N without chemicals Water Wastes Eng. 11 33-36
[5]  
Seyfried C. F.(1975)Nutrient removal in biological systems J. Water Pollut. Contr. 74 143-154
[6]  
Rosenwinkel K. H.(1976)A review of biological phosphorus removal in the activated sludge process Water SA 2 126-144
[7]  
Barker P. S.(1983)Background to biological phosphorus removal Water Sci. Technol. 15 1-13
[8]  
Dold P. L.(1998)Influence of temperature on biological phosphorus removal: Process and molecular ecological studies Water Res. 32 1035-1048
[9]  
Barnard J. L.(1998)Effect of wastewater composition on the development of an activated sludge biological phosphorus removal system Environ. Technol. 20 159-169
[10]  
Barnard J. L.(2000)Anaerobic uptake of different organic substrates by enhanced biological phosphorus removal sludge Environ. Technol. 21 397-405