共 11 条
[1]
Bartal Y.(1995)New algorithms for an ancient scheduling problem J. Comput. Syst. Sci. 51 359-366
[2]
Fiat A.(2000)On-line scheduling revisited J. Sched. 3 343-353
[3]
Karloff H.(1966)Bounds for certain multiprocessing anomalies Bell Syst. Tech. J. 45 1563-1581
[4]
Vohra R.(1996)A better algorithm for an ancient scheduling problem J. Algorithms 20 400-430
[5]
Fleischer R.(1956)Various optimizers for single-stage production Naval Res. Logistics Q. 3 59-66
[6]
Wahl M.(undefined)undefined undefined undefined undefined-undefined
[7]
Graham R. L.(undefined)undefined undefined undefined undefined-undefined
[8]
Karger D. R.(undefined)undefined undefined undefined undefined-undefined
[9]
Philips S. J.(undefined)undefined undefined undefined undefined-undefined
[10]
Torng E.(undefined)undefined undefined undefined undefined-undefined