Monitoring Analysis and Numerical Simulation of the Land Subsidence in Linear Engineering Areas

被引:0
作者
Chao Jia
Xiao Yang
Jing Wu
Pengpeng Ding
Chao Bian
机构
[1] Shandong University,Institute of Marine Science and Technology
[2] Chinese Academy of Sciences,State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics
来源
KSCE Journal of Civil Engineering | 2021年 / 25卷
关键词
Land subsidence; SABS-InSAR; Numerical analysis; High-speed railway; Groundwater over-extraction; Causing factors;
D O I
暂无
中图分类号
学科分类号
摘要
Non-uniform land subsidence can cause subgrade deformation and threaten the safety of linear projects such as high-speed railways. The Lunan high-speed railway is taken as the research background. Combined with the hydrogeological and engineering geological conditions, the regional land subsidence is analyzed by the combined method of the differential interferometric synthetic aperture radar (D-InSAR) and small baseline subset interferometric synthetic aperture radar (SBAS-InSAR), which is verified by using precise leveling and GPS monitoring data. The accurate land subsidence analysis of large-scale linear engineering is realized. The distribution situation and change laws of land subsidence in linear engineering areas are revealed. Then, a three-dimensional coupled numerical model of land subsidence along a large-scale linear project is established by using the finite difference method. The spatial distribution characteristics of land subsidence in the linear engineering area are quantitatively analyzed and predicted. The main factors affecting land subsidence and the degree of land subsidence are discussed while keeping the pumping rate constant. The results show that: 1) The combined method of D-InSAR and SBAS-InSAR has high accuracy in the land subsidence monitoring of linear engineering. 2) There are five non-uniform settlement funnels along the Lunan high-speed railway. The groundwater over-extraction and coal mining are the main reasons for the land subsidence. 3) Realizing water source conversion and reduce groundwater exploitation are the main factors in linear engineering areas as soon as possible.
引用
收藏
页码:2674 / 2689
页数:15
相关论文
共 174 条
  • [61] Li J(undefined)undefined undefined undefined undefined-undefined
  • [62] Jeanne P(undefined)undefined undefined undefined undefined-undefined
  • [63] Farr TG(undefined)undefined undefined undefined undefined-undefined
  • [64] Rutqvist J(undefined)undefined undefined undefined undefined-undefined
  • [65] Vasco DW(undefined)undefined undefined undefined undefined-undefined
  • [66] Jolivet R(undefined)undefined undefined undefined undefined-undefined
  • [67] Agram PS(undefined)undefined undefined undefined undefined-undefined
  • [68] Lin NY(undefined)undefined undefined undefined undefined-undefined
  • [69] Simons M(undefined)undefined undefined undefined undefined-undefined
  • [70] Doin MP(undefined)undefined undefined undefined undefined-undefined