Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations

被引:0
作者
Vedat Toğan
Neslihan Berberoğlu
Tayfun Dede
机构
[1] Karadeniz Technical University,Dept. of Civil Engineering
[2] Artvin Çoruh University,Borçka Acarlar Vocational Scholl
来源
KSCE Journal of Civil Engineering | 2022年 / 26卷
关键词
Construction; Time-cost trade-off problem; Multi-objective optimization; Metaheuristic algorithms; Time-cost optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, four new adaptive weight formulations are developed to enhance the performance of traditional Modified Adaptive Weight Approach (MAWA), which is the simplest way for solving the multi-objective optimization of discrete time-cost trade-off problem (DTCTP). Several numerical experiments are conducted to validate the newly proposed formulations. In addition, three meta-heuristic-based optimization algorithms are utilized to examine the variations within the results of the test instances. The proposed model provides several ways to solve DTCTP, as it includes different formulations and optimization algorithms. So, this model performs well for the medium and large-scale time-cost optimization problems on contrary to the traditional MAWA.
引用
收藏
页码:511 / 521
页数:10
相关论文
共 50 条
[41]   Achieving improved performance in construction projects: advanced time and cost optimization framework [J].
Pham, Vu Hong Son ;
Dang, Nghiep Trinh Nguyen ;
Nguyen, Van Nam .
EVOLUTIONARY INTELLIGENCE, 2024, 17 (04) :2885-2897
[42]   Stochastic time-cost optimization using non-dominated archiving ant colony approach [J].
Kalhor, E. ;
Khanzadi, M. ;
Eshtehardian, E. ;
Afshar, A. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (08) :1193-1203
[43]   Time-cost Trade-off Analysis of Project Using Fuzzy-Genetic Approach [J].
Glisovic, Natasa .
ECONOMICS AND SOCIAL SCIENCE, 2013, 13 :121-126
[44]   Time-cost-quality trade-off analysis for planning construction projects [J].
Wang, Tianqi ;
Abdallah, Moatassem ;
Clevenger, Caroline ;
Monghasemi, Shahryar .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) :82-100
[45]   Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan [J].
Akhund, Muhammad Akram ;
Khoso, Ali Raza ;
Pathan, Ashfaque Ahmed ;
Imad, Hafiz Usama ;
Siddiqui, Fida .
ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (04) :3260-3264
[46]   Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects [J].
Emad Abdelbasset ;
Abbas Hassan ;
Nabil H. Amer ;
Yasser A. Khalifa .
Innovative Infrastructure Solutions, 2023, 8
[47]   Optimizing the number of crews working in parallel and their work sequence to minimize project duration and cost for repetitive construction projects [J].
Abdelbasset, Emad ;
Hassan, Abbas ;
Amer, Nabil H. ;
Khalifa, Yasser A. .
INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2023, 8 (11)
[48]   Cost Development Over-time at Construction Planning Phase: Empirical Evidence from Norwegian Construction Projects [J].
Torp, Olav ;
Belay, Alemu Moges ;
Thodesen, Carl ;
Klakegg, Ole Jonny .
ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 :1177-1184
[49]   Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana [J].
Famiyeh S. ;
Amoatey C.T. ;
Adaku E. ;
Agbenohevi C.S. .
Journal of Engineering, Design and Technology, 2017, 15 (02) :181-198
[50]   SIGNIFICANT FACTORS CAUSING TIME AND COST OVERRUNS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP: CONTRACTORS' PERSPECTIVE [J].
Enshassi, Adnan ;
Kumaraswamy, Mohan ;
Al-Najjar, Jomah .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (01) :35-60