Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations

被引:0
作者
Vedat Toğan
Neslihan Berberoğlu
Tayfun Dede
机构
[1] Karadeniz Technical University,Dept. of Civil Engineering
[2] Artvin Çoruh University,Borçka Acarlar Vocational Scholl
来源
KSCE Journal of Civil Engineering | 2022年 / 26卷
关键词
Construction; Time-cost trade-off problem; Multi-objective optimization; Metaheuristic algorithms; Time-cost optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, four new adaptive weight formulations are developed to enhance the performance of traditional Modified Adaptive Weight Approach (MAWA), which is the simplest way for solving the multi-objective optimization of discrete time-cost trade-off problem (DTCTP). Several numerical experiments are conducted to validate the newly proposed formulations. In addition, three meta-heuristic-based optimization algorithms are utilized to examine the variations within the results of the test instances. The proposed model provides several ways to solve DTCTP, as it includes different formulations and optimization algorithms. So, this model performs well for the medium and large-scale time-cost optimization problems on contrary to the traditional MAWA.
引用
收藏
页码:511 / 521
页数:10
相关论文
共 50 条
  • [31] Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach
    Amir Prasad Behera
    Amit Dhawan
    V. Rathinakumar
    Manish Bharadwaj
    Jay Singh Rajput
    Krushna Chandra Sethi
    [J]. Asian Journal of Civil Engineering, 2025, 26 (2) : 761 - 776
  • [32] The optimization of the time-cost tradeoff problem in projects with conditional activities using of the multi-objective charged system search algorithm (SMOCSS)
    Sharbatdar, M. K.
    Talatahari, S.
    Mousavi, M. R.
    [J]. TARIH KULTUR VE SANAT ARASTIRMALARI DERGISI-JOURNAL OF HISTORY CULTURE AND ART RESEARCH, 2016, 5 (03): : 178 - 194
  • [33] Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search
    Geem, Zong Woo
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (06): : 711 - 716
  • [34] Multi-objective optimization of time-cost-quality in construction projects using genetic algorithm
    Isikyildiz, Setenay
    Akcay, Cemil
    [J]. REVISTA DE LA CONSTRUCCION, 2020, 19 (03): : 335 - 346
  • [35] A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects
    Monghasemi, Shahryar
    Nikoo, Mohammad Reza
    Fasaee, Mohammad Ali Khaksar
    Adamowski, Jan
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3089 - 3104
  • [36] Investigating the Environmental Impacts of Construction Projects in Time-Cost Trade-Off Project Scheduling Problems with CoCoSo Multi-Criteria Decision-Making Method
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    Zavadskas, Edmundas Kazimieras
    Antucheviciene, Jurgita
    [J]. SUSTAINABILITY, 2021, 13 (19)
  • [37] Augmented Time-Cost Trade-Off Optimization Using Particle Swarm Optimization
    Turkoglu, Harun
    Arditi, David
    Polat, Gul
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [38] Fuzzy Based Project Time-Cost Optimization Using Simulated Annealing Search Technique
    Haque, Khan Md. Ariful
    Hasin, M. Ahsan Akhtar
    [J]. INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2014, 5 (01) : 90 - 103
  • [39] An integrated multi-objective optimization model for solving the construction time-cost trade-off problem
    Koo, Choongwan
    Hong, Taehoon
    Kim, Sangbum
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2015, 21 (03) : 323 - 333
  • [40] Application of slime mold algorithm to optimize time, cost and quality in construction projects
    Son, Pham Vu Hong
    Khoi, Luu Ngoc Quynh
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (13) : 1375 - 1386