Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations

被引:0
作者
Vedat Toğan
Neslihan Berberoğlu
Tayfun Dede
机构
[1] Karadeniz Technical University,Dept. of Civil Engineering
[2] Artvin Çoruh University,Borçka Acarlar Vocational Scholl
来源
KSCE Journal of Civil Engineering | 2022年 / 26卷
关键词
Construction; Time-cost trade-off problem; Multi-objective optimization; Metaheuristic algorithms; Time-cost optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, four new adaptive weight formulations are developed to enhance the performance of traditional Modified Adaptive Weight Approach (MAWA), which is the simplest way for solving the multi-objective optimization of discrete time-cost trade-off problem (DTCTP). Several numerical experiments are conducted to validate the newly proposed formulations. In addition, three meta-heuristic-based optimization algorithms are utilized to examine the variations within the results of the test instances. The proposed model provides several ways to solve DTCTP, as it includes different formulations and optimization algorithms. So, this model performs well for the medium and large-scale time-cost optimization problems on contrary to the traditional MAWA.
引用
收藏
页码:511 / 521
页数:10
相关论文
共 50 条
  • [21] Time-cost trade-off optimization with a new initial population approach
    Toğan V.
    Eirgash M.A.
    Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers, 2019, 30 (06): : 9561 - 9580
  • [22] A Constraint Programming Approach for Discrete Time-Cost Tradeoff Problems in a Time-Constrained Activity Network
    Liu, Yang
    Liu, Dawei
    Rong, Yanzhao
    Song, Penghui
    Zou, Xin
    BUILDINGS, 2024, 14 (07)
  • [23] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [24] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058
  • [25] Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning
    Pham, Vu Hong Son
    Dang, Nghiep Trinh Nguyen
    Nam, Nguyen Van
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [26] Multi-objective particle swarm optimization for construction time-cost tradeoff problems
    Zhang, Hong
    Li, Heng
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (01) : 75 - 88
  • [27] TIME-COST TRADE-OFF SCHEDULING UNDER CONSTRUCTION LABOR RESOURCE CONSTRAINTS
    Benjaoran, Vacharapoom
    Sae-Tae, Numpheungk
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2011, 18 (01): : 29 - 39
  • [28] AN ANT COLONY SYSTEM BASED DECISION SUPPORT SYSTEM FOR CONSTRUCTION TIME-COST OPTIMIZATION
    Zhang, Yanshuai
    Ng, S. Thomas
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (04) : 580 - 589
  • [29] Mathematical modelling of embodied energy, greenhouse gases, waste, time-cost parameters of building projects: A review
    Abanda, F. H.
    Tah, J. H. M.
    Cheung, F. K. T.
    BUILDING AND ENVIRONMENT, 2013, 59 : 23 - 37
  • [30] Cost and time risk factors in construction projects in the Dominican Republic
    Fernandez-Valderrama, Pedro
    Urena-Estrella, Crismal
    Moyano, Juan
    Bienvenido-Huertas, David
    FRONTIERS IN BUILT ENVIRONMENT, 2024, 10