Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations

被引:0
|
作者
Vedat Toğan
Neslihan Berberoğlu
Tayfun Dede
机构
[1] Karadeniz Technical University,Dept. of Civil Engineering
[2] Artvin Çoruh University,Borçka Acarlar Vocational Scholl
来源
KSCE Journal of Civil Engineering | 2022年 / 26卷
关键词
Construction; Time-cost trade-off problem; Multi-objective optimization; Metaheuristic algorithms; Time-cost optimization;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, four new adaptive weight formulations are developed to enhance the performance of traditional Modified Adaptive Weight Approach (MAWA), which is the simplest way for solving the multi-objective optimization of discrete time-cost trade-off problem (DTCTP). Several numerical experiments are conducted to validate the newly proposed formulations. In addition, three meta-heuristic-based optimization algorithms are utilized to examine the variations within the results of the test instances. The proposed model provides several ways to solve DTCTP, as it includes different formulations and optimization algorithms. So, this model performs well for the medium and large-scale time-cost optimization problems on contrary to the traditional MAWA.
引用
收藏
页码:511 / 521
页数:10
相关论文
共 50 条
  • [1] Optimizing of Discrete Time-Cost in Construction Projects Using New Adaptive Weight Formulations
    Togan, Vedat
    Berberoglu, Neslihan
    Dede, Tayfun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (02) : 511 - 521
  • [2] New adaptive weight formulations for time-cost optimization
    Togan, Vedat
    Berberoglu, Neslihan
    Basaga, Hasan Basri
    STRUCTURES, 2020, 28 : 2291 - 2299
  • [3] Time-cost optimization using harmony search algorithm in construction projects
    Zalmai, Lemar Mohammad
    Akcay, Cemil
    Manisali, Ekrem
    REVISTA DE LA CONSTRUCCION, 2019, 18 (02): : 226 - 237
  • [4] Research on Time-Cost Optimization Model of Construction Projects
    Huang, Jian-wen
    Wang, Xing-xia
    Zhou, Yi-hong
    Huang, Jian-wen
    Wang, Xing-xia
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7710 - +
  • [5] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
  • [6] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [7] Self-adaptive ant colony optimization for construction time-cost optimization
    Li, Huimin
    Li, Peng
    KYBERNETES, 2013, 42 (08) : 1181 - 1194
  • [8] Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects
    Eirgash, Mohammad Azim
    Togan, Vedat
    Dede, Tayfun
    Basaga, Hasan Basri
    STRUCTURES, 2023, 53 : 806 - 821
  • [9] Using Genetic Algorithms for Optimizing and Modelling Time, Cost and Quality Trade Offs of Construction Projects
    Bragadin, Marco A.
    Ballabeni, Andrea
    Kahkonen, Kalle
    IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2018, 9 (13): : 200 - 207
  • [10] Time-cost relationship for predicting construction duration
    Czarnigowska, A.
    Sobotka, A.
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2013, 13 (04) : 518 - 526