共 39 条
[1]
Antonelli C. J.(1986)Hierarchical Decomposition and Simulation of Manufacturing Cells Using Ada Simulation 46 141-152
[2]
Volz R. A.(1998)Intelligent Decision Support System for Flexible Manufacturing System Design Annals of Operations Research 77 129-156
[3]
Mudge T.(1985)Simulation of Flexible Manufacturing Systems Simulation 45 299-302
[4]
Borenstein D.(1992)Modern Tools for the Design, Modeling, and Evaluation of Flexible Manufacturing Systems International Journal of Robotics and Computer-Integrated Manufacturing 9 335-340
[5]
Cheng T. C. E.(1997)Empirically Testing the Antecedents of BPR Success International Journal of Production Economics 50 199-210
[6]
EI Maraghy H. A.(1997)Editorial, Business Process Reengineering: Modelling and Analysis International Journal of Production Economics 50 65-68
[7]
Ravi T.(1997)The Role of Information Technology in Business Reengineering International Journal of Production Economics 50 91-104
[8]
Guimaraes T.(1988)ASimulation Generator for Flexible Manufacturing Systems Design and Control IEE Transactions 20 22-31
[9]
Gunasekaran A.(1997)An Example of the Application of Production System Design Tools for the Implementation of Business Process Reengineering International Journal of Production Economics 50 69-78
[10]
Ichimura T.(1995)Reengineering Customer Services at BOC Gases Australia Business Change and Reengineering 2 4-17