Theoretical Research and Simulation Analysis on the Cutter Spacing of Double Disc Cutters Breaking Rock

被引:0
作者
Peng Zhou
Jingjing Guo
Jian Sun
Defang Zou
机构
[1] Jilin University,School of Mechanical Science & Engineering
[2] Shenyang Jianzhu University,School of Traffic Engineering
[3] Shenyang Jianzhu University,School of Mechanical Engineering
来源
KSCE Journal of Civil Engineering | 2019年 / 23卷
关键词
disc cutter; cutter head; double disc cutters; rock breaking force; cutter spacing;
D O I
暂无
中图分类号
学科分类号
摘要
The arrangement of disc cutter on a cutter head is important to improve the performance of TBM (tunnel boring machine) cutter, cutter life and cutter disc bearing life, then reduce vibration of TBM and reduce the noise. The rock breaking with double disc cutters is the basis of study on the distribution of disc cutter on cutter head, and it plays an important role on optimum arrangement of disc cutter on cutter head. In the process of rock breaking with double disc cutters, the axial vertical distance between two cutters is an important construction parameter, which directly affects rock breaking efficiency. Therefore, research on optimal cutter spacing and analysis of adaptability between cutter spacing and rock characteristics play an important role in optimizing the arrangement of cutter on the cutter head and improving the rock breaking efficiency of TBM. This paper analyzed the breaking rock force of double disc cutters. Taking granite samples as an example, the process of rock breaking with double disc cutters was simulated. Then rock fragmentation analysis based on different cutter spacing was carried out. Finally, the rock of different cutter spacing adaptability was studied. A series of conclusions about double disc cutters breaking rock were drawn.
引用
收藏
页码:3218 / 3227
页数:9
相关论文
共 73 条
  • [11] Yan Q(2014)Progresses and challenges in supporting activities toward a license to operate European TBM systems in ITER Fusion Engineering and Design 89 1113-1118
  • [12] Heim A(2010)On three-dimensional modelling of crack growth using partition of unity methods Computers & Structures 88 1391-1411
  • [13] Li G(2014)Advance probing measures on the TBM drives of the south contracts of the Gotthard Base Tunnel-experience and implications for other projects Geomechanics and Tunnelling 7 551-561
  • [14] Zhu L(2017)Dual-horizon peridynamics: A stable solution to varying horizons Computer Methods in Applied Mechanics & Engineering 318 762-782
  • [15] Yang J(1985)Prediction of the performance of disc cutters in anisotropic rock International Journal of Rock Mechanics & Mining Sciences & Geomechanics Abstracts 22 153-161
  • [16] Li G(2014)Design and analysis of a micro tunnel boring machines (TBM) Universal Journal of Mechanical Engineering 2 87-93
  • [17] Zhu L(2011)Numerical simulation study on Influencing Factors of rock breaking process of TBM disc cutter Chinese Journal of Geotechnical Mechanics 32 1891-1897
  • [18] Yang J(2012)Study on rock breaking dynamic characteristics and optimum cutter spacing of TBM disc cutter Journal of rock mechanics and Engineering 31 2453-2464
  • [19] Wang W(2016)Finite element modal analysis and experiment of TBM disc cutter system Modern Manufacturing Engineering 5 69-74
  • [20] Liu Q(2014)Study on rock mass boreability by TBM penetration test under different in situ stress conditions Tunneling and Underground Space Technology 43 413-426