共 73 条
- [11] Yan Q(2014)Progresses and challenges in supporting activities toward a license to operate European TBM systems in ITER Fusion Engineering and Design 89 1113-1118
- [12] Heim A(2010)On three-dimensional modelling of crack growth using partition of unity methods Computers & Structures 88 1391-1411
- [13] Li G(2014)Advance probing measures on the TBM drives of the south contracts of the Gotthard Base Tunnel-experience and implications for other projects Geomechanics and Tunnelling 7 551-561
- [14] Zhu L(2017)Dual-horizon peridynamics: A stable solution to varying horizons Computer Methods in Applied Mechanics & Engineering 318 762-782
- [15] Yang J(1985)Prediction of the performance of disc cutters in anisotropic rock International Journal of Rock Mechanics & Mining Sciences & Geomechanics Abstracts 22 153-161
- [16] Li G(2014)Design and analysis of a micro tunnel boring machines (TBM) Universal Journal of Mechanical Engineering 2 87-93
- [17] Zhu L(2011)Numerical simulation study on Influencing Factors of rock breaking process of TBM disc cutter Chinese Journal of Geotechnical Mechanics 32 1891-1897
- [18] Yang J(2012)Study on rock breaking dynamic characteristics and optimum cutter spacing of TBM disc cutter Journal of rock mechanics and Engineering 31 2453-2464
- [19] Wang W(2016)Finite element modal analysis and experiment of TBM disc cutter system Modern Manufacturing Engineering 5 69-74
- [20] Liu Q(2014)Study on rock mass boreability by TBM penetration test under different in situ stress conditions Tunneling and Underground Space Technology 43 413-426