Theoretical Research and Simulation Analysis on the Cutter Spacing of Double Disc Cutters Breaking Rock

被引:0
作者
Peng Zhou
Jingjing Guo
Jian Sun
Defang Zou
机构
[1] Jilin University,School of Mechanical Science & Engineering
[2] Shenyang Jianzhu University,School of Traffic Engineering
[3] Shenyang Jianzhu University,School of Mechanical Engineering
来源
KSCE Journal of Civil Engineering | 2019年 / 23卷
关键词
disc cutter; cutter head; double disc cutters; rock breaking force; cutter spacing;
D O I
暂无
中图分类号
学科分类号
摘要
The arrangement of disc cutter on a cutter head is important to improve the performance of TBM (tunnel boring machine) cutter, cutter life and cutter disc bearing life, then reduce vibration of TBM and reduce the noise. The rock breaking with double disc cutters is the basis of study on the distribution of disc cutter on cutter head, and it plays an important role on optimum arrangement of disc cutter on cutter head. In the process of rock breaking with double disc cutters, the axial vertical distance between two cutters is an important construction parameter, which directly affects rock breaking efficiency. Therefore, research on optimal cutter spacing and analysis of adaptability between cutter spacing and rock characteristics play an important role in optimizing the arrangement of cutter on the cutter head and improving the rock breaking efficiency of TBM. This paper analyzed the breaking rock force of double disc cutters. Taking granite samples as an example, the process of rock breaking with double disc cutters was simulated. Then rock fragmentation analysis based on different cutter spacing was carried out. Finally, the rock of different cutter spacing adaptability was studied. A series of conclusions about double disc cutters breaking rock were drawn.
引用
收藏
页码:3218 / 3227
页数:9
相关论文
共 73 条
  • [1] Cho J W(2010)Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method Tunneling & Underground Space Technology 25 230-244
  • [2] Jeon S(2014)A new model for TBM performance prediction in blocky rock conditions Tunneling and Underground Space Technology 43 440-452
  • [3] Yu S H(2013)Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel Tunneling and Underground Space Technology 33 131-142
  • [4] Chang S H(2017)Analysis of rock breaking efficiency of TBM disc shaped disc cutter for railway tunnel under different penetration Subgrade construction 3 49-54
  • [5] Delisio A(2012)Equipment for advance probing and for advance treatment of the ground from the TBM Geomechanics and Tunnelling 5 57-66
  • [6] Zhao J(2014)Prediction method of TBM disc cutter wear in hard rock based on CSM model China Mechanical Engineering 25 33-35
  • [7] Delisio A(2012)Calculation mechanics model and solution of TBM disc cutter based on CSM model Mining Machine 40 8-11
  • [8] Zhao J(2013)Study on rock breaking force calculation model of TBM disc cutter Journal of China Coal Society 38 1136-1142
  • [9] Einstein H H(2014)Numerical analysis of rotary breaking performance of TBM disc cutter Journal of Shenyang University of Technology 36 51-56
  • [10] Deng Z(2014)The confining pressure effect of rock breaking mechanism of TBM cutter Journal of Rock Mechanics and Engineering 33 2743-2749