Genetic Algorithm Based Parameter Estimation of Nash Model

被引:0
作者
Si-Hui Dong
机构
[1] Dalian Jiaotong University,School of Environment Science and Engineering
来源
Water Resources Management | 2008年 / 22卷
关键词
Empirical unit hydrograph; Instantaneous unit hydrograph; Time step unit hydrograph; Flood forecast; Parameter estimation; Genetic algorithm; Net rain;
D O I
暂无
中图分类号
学科分类号
摘要
Unit hydrograph method is usually used to resolve surface runoff concentration process. Empirical unit hydrograph is sometimes jagged and not smooth because of estimation errors. Owing to the randomicity of correction method, there is some localization in its application. The application of instantaneous unit hydrograph is relatively wider. Generally, moment method is used to estimate the parameters of instantaneous unit hydrograph. However, the error is obvious between the observed flood process and the predicted flood process with moment method, especially near the flood peak. The genetic algorithm toolbox of matlab software is used to optimize the parameters of instantaneous unit hydrograph. The statistical function gamcdf(x, α, β) in matlab toolbox is used to calculate S(t) curve, which can avoid the errors caused by approximate formula method. The case study indicates that the weighted sum of absolute error applying the method in this paper is 25, the result applying moment method is 63, and the result of approximate formula method is 49. The results show that the method in this paper is more effectual than the other two methods.
引用
收藏
页码:525 / 533
页数:8
相关论文
共 39 条
  • [1] Cheng CT(2006)Using genetic algorithm and TOPSIS for Xinanjiang model calibration with a single procedure J Hydrol 316 129-140
  • [2] Zhao MY(2006)Analytical model for a geomorphological instantaneous unit hydrograph Hydrol Proc 20 3879-3895
  • [3] Chau KW(1997)Comparing several genetic algorithm schemes for the calibration of conceptual rainfall-runoff models Hydrol Sci J 42 357-379
  • [4] Fleurant C(2003)Rapid calculation to instantaneous unit hydrograph based on Excel Yangtze River 2 6-7
  • [5] Kartiwa B(1980)A representation of an instantaneous unit hydrograph from geomorphology Wat Resour Res 16 855-862
  • [6] Roland B(2003)Optimal evaluation to instantaneous unit hydrograph J Hydroelect Eng 1 70-75
  • [7] Franchini M(2001)Genetic programming and its application in real-time runoff forecasting J Am Water Resour Assoc 37 439-451
  • [8] Galeati G(1996)General stochastic instantaneous unit hydrograph J Hydrol 182 227-238
  • [9] Geng HJ(1996)Unit hydrograph derived from a spatially distributed velocity field Hydrol Proc 10 831-844
  • [10] Qi SR(1960)A unit hydrograph study with particular reference to British catchments Proc Inst Civ Eng 17 249-282