Split scheduling with uniform setup times

被引:0
作者
Frans Schalekamp
René Sitters
Suzanne van der Ster
Leen Stougie
Víctor Verdugo
Anke van Zuylen
机构
[1] College of William & Mary,Department of Mathematics
[2] VU University Amsterdam,Department of Operations Research
[3] CWI,Department of Industrial Engineering
[4] University of Chile,undefined
来源
Journal of Scheduling | 2015年 / 18卷
关键词
Scheduling; Job splitting; Setup times; Complexity theory; Approximation algorithms;
D O I
暂无
中图分类号
学科分类号
摘要
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machine- and sequence-independent. Problems of this kind were encountered when modelling practical problems in planning disaster relief operations. Our main algorithmic result is a polynomial-time algorithm for minimising total completion time on two parallel identical machines. We argue, why the same problem with three machines is not an easy extension of the two-machine case, leaving the complexity of this case as a tantalising open problem. We give a constant-factor approximation algorithm for the general case with any number of machines and a polynomial-time approximation scheme for a fixed number of machines. For the version with the objective to minimise total weighted completion time, we prove NP-hardness. Finally, we conclude with an overview of the state of the art for other split scheduling problems with job-, machine- and sequence-independent setup times.
引用
收藏
页码:119 / 129
页数:10