Two-machine flowshop scheduling problem with coupled-operations

被引:0
作者
Nadjat Meziani
Ammar Oulamara
Mourad Boudhar
机构
[1] Abderrahmane Mira University,LORIA Laboratory, UMR CNRS 75003
[2] University of Lorraine,RECITS Laboratory, Faculty of Mathematics
[3] University of Sciences and Technology Houari Boumediene (USTHB),undefined
来源
Annals of Operations Research | 2019年 / 275卷
关键词
Flowshop; Coupled-operations; Complexity; Polynomial time algorithms;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses a generalization of the coupled-operations scheduling problem in the context of a flow shop environment. We consider the two-machine scheduling problem with the objective of minimizing the makespan. Each job consists of a coupled-operation to be processed first on the first machine and a single operation to be then processed on the second machine. A coupled-operation contains two operations separated by an exact time delay. The single operation can start on the second machine only when the coupled-operation on the first machine is completed. We prove the NP-completeness of two restricted versions of the general problem, whereas we also exhibit several other well solvable cases.
引用
收藏
页码:511 / 530
页数:19
相关论文
共 40 条
[1]  
Ageev AA(2007)Approximation algorithms for UET scheduling problems with exact delays Operations Research Letters 35 533-540
[2]  
Baburin AE(2004)An exact algorithm for scheduling identical coupled tasks Mathematical Methods of Operational Research 59 193-203
[3]  
Ahr D(2010)Scheduling of coupled tasks with unit processing times Journal of Scheduling 13 453-461
[4]  
Békési J(2012)New algorithms for coupled tasks scheduling—A survey RAIRO - Operations Research 46 335-353
[5]  
Galambos G(2009)Scheduling of coupled tasks and one-machine no-wait robotic cells Computers and Operational Research 36 301-307
[6]  
Oswald M(1996)Shop problems with two machines and time lags Operations Research 44 777-787
[7]  
Reinelt G(2006)Permutation flowshop scheduling problem with maximal and minimal time lags Computers and Operations Research 33 1540-1556
[8]  
Blazewicz J(2008)Permutation flow shop scheduling problems with time lags to minimize the weighted sum of machine completion times International Journal of Production Economics 112 168-176
[9]  
Ecker K(1954)Optimal two and three stage production schedules with setup time included Naval Research Logistics Quarterly 1 61-67
[10]  
Kis T(1958)Sequencing Management Science 5 293-298