Ageev AA(2007)Approximation algorithms for UET scheduling problems with exact delays Operations Research Letters 35 533-540
[2]
Baburin AE(2004)An exact algorithm for scheduling identical coupled tasks Mathematical Methods of Operational Research 59 193-203
[3]
Ahr D(2010)Scheduling of coupled tasks with unit processing times Journal of Scheduling 13 453-461
[4]
Békési J(2012)New algorithms for coupled tasks scheduling—A survey RAIRO - Operations Research 46 335-353
[5]
Galambos G(2009)Scheduling of coupled tasks and one-machine no-wait robotic cells Computers and Operational Research 36 301-307
[6]
Oswald M(1996)Shop problems with two machines and time lags Operations Research 44 777-787
[7]
Reinelt G(2006)Permutation flowshop scheduling problem with maximal and minimal time lags Computers and Operations Research 33 1540-1556
[8]
Blazewicz J(2008)Permutation flow shop scheduling problems with time lags to minimize the weighted sum of machine completion times International Journal of Production Economics 112 168-176
[9]
Ecker K(1954)Optimal two and three stage production schedules with setup time included Naval Research Logistics Quarterly 1 61-67
[10]
Kis T(1958)Sequencing Management Science 5 293-298