Criticality analysis of activity networks under interval uncertainty

被引:0
作者
Jérôme Fortin
Paweł Zieliński
Didier Dubois
Hélène Fargier
机构
[1] Université Montpellier 2 and CNRS,LIRMM
[2] Wrocław University of Technology,Institute of Mathematics and Computer Science
[3] Université Paul Sabatier,I.R.I.T.
来源
Journal of Scheduling | 2010年 / 13卷
关键词
Project scheduling; Interval PERT; Criticality; Interval uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
This paper reconsiders the Project Evaluation and Review Technique (PERT) scheduling problem when information about task duration is incomplete. We model uncertainty on task durations by intervals. With this problem formulation, our goal is to assert possible and necessary criticality of the different tasks and to compute their possible earliest starting dates, latest starting dates, and floats. This paper combines various results and provides a complete solution to the problem. We present the complexity results of all considered subproblems and efficient algorithms to solve them.
引用
收藏
页码:609 / 627
页数:18
相关论文
共 70 条
[51]  
Ludwig A.(undefined)undefined undefined undefined undefined-undefined
[52]  
Möhring R. H.(undefined)undefined undefined undefined undefined-undefined
[53]  
Stork F.(undefined)undefined undefined undefined undefined-undefined
[54]  
Malcolm D. G.(undefined)undefined undefined undefined undefined-undefined
[55]  
Roseboom J. H.(undefined)undefined undefined undefined undefined-undefined
[56]  
Clark C. E.(undefined)undefined undefined undefined undefined-undefined
[57]  
Fazar W.(undefined)undefined undefined undefined undefined-undefined
[58]  
McCahon C. S.(undefined)undefined undefined undefined undefined-undefined
[59]  
McCahon C. S.(undefined)undefined undefined undefined undefined-undefined
[60]  
Lee E. S.(undefined)undefined undefined undefined undefined-undefined