共 157 条
- [1] Alley BL(2013)Seasonal performance of a hybrid pilot-scale constructed wetland treatment system for simulated fresh oil field produced water Water, Air, and Soil Pollution 244 1639-67
- [2] Willis B(2013)Bioremediation of arsenic-contaminated water: recent advances and future prospects Water, Air, and Soil Pollution 244 1722-92
- [3] Rodgers J(2005)Removal of arsenic from water by zero-valent iron Journal of Hazardous Materials 121 61-252
- [4] Castle JW(1997)Occurrence of arsenic-contaminated groundwater in alluvial aquifers from delta plains, Eastern India: options for safe drinking water supply International Journal of Water Resources Development 13 79-26
- [5] Bahar MM(2005)Removal of arsenic and zinc using different laboratory model wetland systems Engineering in Life Sciences 5 247-6
- [6] Megharaj M(2009)Geochemical processes controlling fate and transport of arsenic in acid mine drainage (AMD) and natural systems Journal of Hazardous Materials 165 13-101
- [7] Naidu R(1994)Design criteria and practice for constructed wetlands Water Science and Technology 29 1-947
- [8] Bang S(1992)Acid volatile sulfide predicts the acute toxicity of cadmium and nickel in sediments Environmental Science & Technology 26 96-2032
- [9] Korfiatis GP(2009)Performance of a pilot-scale constructed wetland system for treating simulated ash basin water Chemosphere 75 939-890
- [10] Meng X(2001)Electrochemical and spectroscopic study of arsenate removal from water using zero-valent iron media Environmental Science & Technology 35 2026-181