Management of complexity in enterprise integration projects by the PERA methodology

被引:0
|
作者
Hong Li
Theodore J. Williams
机构
[1] Purdue University,Purdue Laboratory for Applied Industrial Control
来源
Journal of Intelligent Manufacturing | 2002年 / 13卷
关键词
Enterprise; computer integrated manufacturing; reference architecture; formalism; hierarchy; work flow;
D O I
暂无
中图分类号
学科分类号
摘要
The issue of the presentation and management of complexity is one of the most important aspects of the development and use of enterprise reference architectures and their associated methodologies. There is a limit to the degree of detail that any level of decision-making can comprehend adequately. As the breadth of vision of a decision expands the degree of detail must be correspondingly reduced. It is thus impossible to present every detail of any real world problem. The presentation has to be based on the principle of minimal complexity at any point. Therefore, the formalism of an enterprise reference architecture needs only to capture the most important factors at each stage of complexity. A hierarchical approach is thus inevitable. This article proposes a four-level formalism as a hierarchical model for use in further studies on the presentation of complexity management. These four levels include architectural, interface, design tool and semantic methods. The impact of complexity management on workflow design for enterprise integration is also discussed.
引用
收藏
页码:417 / 427
页数:10
相关论文
共 50 条
  • [31] Achieving integration on capital projects with enterprise resource planning systems
    O'Connor, JT
    Dodd, SC
    AUTOMATION IN CONSTRUCTION, 2000, 9 (5-6) : 515 - 524
  • [32] Adopting Notions of Complexity for Enterprise Architecture Management
    Schneider, Alexander W.
    Zec, Marin
    Matthes, Florian
    AMCIS 2014 PROCEEDINGS, 2014,
  • [33] Complexity and behavior choice of enterprise strategic management
    Zhang, Yi
    Zhang, Rui
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 944 - 948
  • [34] Toward a Methodology for Managing Complexity in Information Systems Development Projects
    Mir, Shiva
    Hawryszlciewycz, Igor
    Zowghi, Didar
    INNOVATION VISION 2020: SUSTAINABLE GROWTH, ENTREPRENEURSHIP, AND ECONOMIC DEVELOPMENT, VOLS 1-4, 2012, : 1945 - 1950
  • [35] INTEGRATION OF LEAN MANAGEMENT WITH ISO MANAGEMENT SYSTEMS IN ENTERPRISE
    Wirkus, Marek
    Chmielarz, Anna
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2018, 9 (03) : 100 - 107
  • [36] Integration analysis of enterprise project management and strategic management
    Lu, WX
    An, SL
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: MODERN INDUSTRIAL ENGINEERING AND INNOVATION IN ENTERPRISE MANAGEMENT, 2005, : 1441 - 1444
  • [37] PROSPECTS FOR IMPROVING THE METHODOLOGY OF STRATEGIC ENTERPRISE MANAGEMENT
    Faizova, Svitlana
    Ivanova, Marina
    Pozhuieva, Tetiana
    BALTIC JOURNAL OF ECONOMIC STUDIES, 2018, 4 (05) : 371 - 378
  • [38] Development of complexity management strategies for construction projects
    Kermanshachi, Sharareh
    Nipa, Thahomina Jahan
    Bac Dao
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023, 21 (06) : 1633 - 1657
  • [39] Systematic goal definition for complexity management projects
    Daniilidis, Harry
    Bauer, Wolfgang
    Eben, Katharina
    Lindemann, Udo
    2012 IEEE INTERNATIONAL SYSTEMS CONFERENCE (SYSCON), 2012, : 423 - 427
  • [40] Applications of enterprise project management solution in windpower projects
    Prostean, G.
    Izvercianu, M.
    Giuca, M.
    Management of Technological Changes, Book 2, 2005, : 339 - 344