Management of complexity in enterprise integration projects by the PERA methodology

被引:0
|
作者
Hong Li
Theodore J. Williams
机构
[1] Purdue University,Purdue Laboratory for Applied Industrial Control
来源
Journal of Intelligent Manufacturing | 2002年 / 13卷
关键词
Enterprise; computer integrated manufacturing; reference architecture; formalism; hierarchy; work flow;
D O I
暂无
中图分类号
学科分类号
摘要
The issue of the presentation and management of complexity is one of the most important aspects of the development and use of enterprise reference architectures and their associated methodologies. There is a limit to the degree of detail that any level of decision-making can comprehend adequately. As the breadth of vision of a decision expands the degree of detail must be correspondingly reduced. It is thus impossible to present every detail of any real world problem. The presentation has to be based on the principle of minimal complexity at any point. Therefore, the formalism of an enterprise reference architecture needs only to capture the most important factors at each stage of complexity. A hierarchical approach is thus inevitable. This article proposes a four-level formalism as a hierarchical model for use in further studies on the presentation of complexity management. These four levels include architectural, interface, design tool and semantic methods. The impact of complexity management on workflow design for enterprise integration is also discussed.
引用
收藏
页码:417 / 427
页数:10
相关论文
共 50 条
  • [21] Special issue on enterprise integration and management - Volume no II: Planning and management issues in enterprise integration
    Gunasekaran, A
    Sarhadi, M
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1997, 5 (02): : 98 - 100
  • [22] THE RISK MANAGEMENT METHODOLOGY IN THE METALLURGICAL ENTERPRISE
    Malysa, Tomasz
    Nowacki, Krzysztof
    Furman, Joanna
    METAL 2016: 25TH ANNIVERSARY INTERNATIONAL CONFERENCE ON METALLURGY AND MATERIALS, 2016, : 1925 - 1930
  • [23] Outlining a Process to Manage the Complexity of Enterprise Systems Integration
    Kahkonen, Tommi
    Smolander, Kari
    ICEIS: PROCEEDINGS OF THE 19TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS - VOL 3, 2017, : 306 - 315
  • [24] Complexity analysis and modeling of enterprise information resources integration
    Lao, Guoling
    Xing, Lei
    He, Xuejuan
    2007 IEEE INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION, VOLS 1-7, 2007, : 2461 - 2466
  • [25] How to: Change Management in Enterprise Technology Projects
    Guseva, Irina
    ECONTENT, 2014, 37 (02) : 31 - 31
  • [26] Projects and planning in Russian enterprise management practices
    Kornilov, VV
    SOTSIOLOGICHESKIE ISSLEDOVANIYA, 2002, (12): : 76 - 86
  • [27] METHODOLOGY OF RISK MANAGEMENT IN PIPELINE PROJECTS
    Agrawal, J. P. N.
    Srivastava, S. P.
    PROCEEDINGS OF THE ASME INDIA OIL AND GAS PIPELINE CONFERENCE, 2013, 2013,
  • [28] An enterprise application integration methodology for e-government
    Janssen, Marijn
    Cresswell, Anthony M.
    JOURNAL OF ENTERPRISE INFORMATION MANAGEMENT, 2005, 18 (05) : 531 - +
  • [29] Integration of IT Service Management into Enterprise Architecture
    Braun, Christian
    Winter, Robert
    APPLIED COMPUTING 2007, VOL 1 AND 2, 2007, : 1215 - 1219
  • [30] Enterprise integration of management and automation in a refinery
    Wang, CG
    KNOWLEDGE AND SKILL CHAINS IN ENGINEERING AND MANUFACTURING: INFORMATION INFRASTRUCTURE IN THE ERA OF GLOBAL COMMUNICATIONS, 2005, 168 : 321 - 328