The berth scheduling problem with customer differentiation: a new methodological approach based on hierarchical optimization

被引:0
|
作者
G. K. D. Saharidis
M. M. Golias
M. Boile
S. Theofanis
M. G. Ierapetritou
机构
[1] Freight and Maritime Program (FMP),Center for Advanced Infrastructure and Transportation (CAIT)
[2] Rutgers University,Department of Civil Engineering
[3] Memphis University,Department of Civil and Environmental Engineering
[4] Freight and Maritime Program (FMP),Department of Chemical and Biomedical Engineering
[5] Rutgers University,undefined
[6] Rutgers University,undefined
来源
The International Journal of Advanced Manufacturing Technology | 2010年 / 46卷
关键词
Container terminal operations; Berth scheduling; Multi-objective optimization; Hierarchical optimization; Bi-level; -th best algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
The berth scheduling problem deals with the assignment of vessels to berth space in a container terminal. Defining berth schedules in container terminal operations translates in meeting different objectives that are often non-commensurable and gaining an improvement on one objective often causes degrading performance on the others. In this paper the discrete space and dynamic arrival berth scheduling problem is studied and formulated for the first time via a hierarchical optimization framework, using two levels of hierarchy that differentiate between two conflicting objectives terminal operators face when defining vessel to berth assignments. For the resolution of this problem an interactive algorithm is developed based on the k-th best algorithm for the case where multi-objective functions are considered in the upper level. Computational examples showed that the proposed algorithm gives optimal or near optimal solutions that are comparable to the ones obtained by its single level formulation counterpart.
引用
收藏
页码:377 / 393
页数:16
相关论文
共 50 条
  • [21] An optimization framework for the sustainable healthcare facility location problem using a hierarchical conflict resolution approach
    Aslani, Babak
    Rabiee, Meysam
    Jabbari, Mona
    Delen, Dursun
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (SUPPL 1) : 31 - 32
  • [22] Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach
    Reza Alinezhad
    Ramin Ansari
    Mahdi Mahdikhani
    Sayyid Ali Banihashemi
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2022, 46 : 2575 - 2591
  • [23] Multi-phase Projects Selection and Scheduling Problem: A Multi-objective Optimization Approach
    Alinezhad, Reza
    Ansari, Ramin
    Mahdikhani, Mahdi
    Banihashemi, Sayyid Ali
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2022, 46 (03) : 2575 - 2591
  • [24] Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs
    Cheng, Mingbao
    Tadikamalla, Pandu R.
    Shang, Jennifer
    Zhang, Shaqing
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 234 (03) : 650 - 657
  • [25] A bi-objective hierarchical program scheduling problem and its solution based on NSGA-III
    Wuliang Peng
    Jiali lin
    Jingwen Zhang
    Liangwei Chen
    Annals of Operations Research, 2022, 308 : 389 - 414
  • [26] A bi-objective hierarchical program scheduling problem and its solution based on NSGA-III
    Peng, Wuliang
    Lin, Jiali
    Zhang, Jingwen
    Chen, Liangwei
    ANNALS OF OPERATIONS RESEARCH, 2022, 308 (1-2) : 389 - 414
  • [27] Flexible Job Shop Scheduling Problem Based on Multi-Objective Optimization Algorithm
    Zhang, Li
    Wang, Lu
    PROCEEDINGS OF THE 2018 INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC, CONTROL AND AUTOMATION ENGINEERING (MECAE 2018), 2018, 149 : 580 - 588
  • [28] A new container scheduling algorithm based on multi-objective optimization
    Liu, Bo
    Li, Pengfei
    Lin, Weiwei
    Shu, Na
    Li, Yin
    Chang, Victor
    SOFT COMPUTING, 2018, 22 (23) : 7741 - 7752
  • [29] A new container scheduling algorithm based on multi-objective optimization
    Bo Liu
    Pengfei Li
    Weiwei Lin
    Na Shu
    Yin Li
    Victor Chang
    Soft Computing, 2018, 22 : 7741 - 7752
  • [30] Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm
    Ausaf M.F.
    Gao L.
    Li X.
    Frontiers of Mechanical Engineering, 2015, 10 (4) : 392 - 404