A multi objective volleyball premier league algorithm for green scheduling identical parallel machines with splitting jobs

被引:0
作者
Khodakaram Salimifard
Jingpeng Li
Davood Mohammadi
Reza Moghdani
机构
[1] CIIORG,Division of Computer Science and Mathematics
[2] Persian Gulf University,undefined
[3] University of Stirling,undefined
来源
Applied Intelligence | 2021年 / 51卷
关键词
Parallel machine scheduling; Splitting jobs; Wastes; Total tardiness; Multi-objective optimisation; Volleyball premier league;
D O I
暂无
中图分类号
学科分类号
摘要
Parallel machine scheduling is one of the most common studied problems in recent years, however, this classic optimization problem has to achieve two conflicting objectives, i.e. minimizing the total tardiness and minimizing the total wastes, if the scheduling is done in the context of plastic injection industry where jobs are splitting and molds are important constraints. This paper proposes a mathematical model for scheduling parallel machines with splitting jobs and resource constraints. Two minimization objectives - the total tardiness and the number of waste - are considered, simultaneously. The obtained model is a bi-objective integer linear programming model that is shown to be of NP-hard class optimization problems. In this paper, a novel Multi-Objective Volleyball Premier League (MOVPL) algorithm is presented for solving the aforementioned problem. This algorithm uses the crowding distance concept used in NSGA-II as an extension of the Volleyball Premier League (VPL) that we recently introduced. Furthermore, the results are compared with six multi-objective metaheuristic algorithms of MOPSO, NSGA-II, MOGWO, MOALO, MOEA/D, and SPEA2. Using five standard metrics and ten test problems, the performance of the Pareto-based algorithms was investigated. The results demonstrate that in general, the proposed algorithm has supremacy than the other four algorithms.
引用
收藏
页码:4143 / 4161
页数:18
相关论文
共 204 条
[61]  
Çelik C(2014)Scheduling jobs with equal-processing-time on parallel machines with non-identical capacities to minimize makespan Int J Prod Econ 156 325-331
[62]  
Park T(2007)A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times Eur J Oper Res 176 1508-1527
[63]  
Lee T(2017)Reliable Back-up Facility in Distribution Network Prog Comput Sci 115 312-321
[64]  
Ouk Kim C(2019)Quantum-inspired cuckoo co-search algorithm for no-wait flow shop scheduling Appl Intell 49 791-803
[65]  
Shim S-O(2018)An effective operations permutation-based discrete harmony search approach for the flexible job shop scheduling problem with makespan criterion Appl Intell 48 1423-1441
[66]  
Kim Y-D(2004)Local Search Genetic Algorithms for the Job Shop Scheduling Problem Appl Intell 21 99-109
[67]  
Kim Y(2016)Hybrid metaheuristics for scheduling of machines and transport robots in job shop environment Appl Intell 45 808-828
[68]  
Shim S(2018)Volleyball Premier League Algorithm Appl Soft Comput 64 161-185
[69]  
Kim S(2015)A novel multi-objective particle swarm optimization with multiple search strategies Eur J Oper Res 247 732-744
[70]  
Choi Y(2016)Multi-objective multi-layer congested facility location-allocation problem optimization with Pareto-based meta-heuristics Appl Math Model 40 4948-4969