Experimental Study on the Long-Term Behaviour of RBPC T-Beams

被引:0
作者
Guohui Cao
Wang Zhang
Jiaxing Hu
Kai Zhang
机构
[1] Hunan City University,College of Civil Engineering
[2] Changsha University of Science and Technology,College of Civil Engineering and Architecture
[3] Hunan University,College of Civil Engineering
来源
International Journal of Civil Engineering | 2018年 / 16卷
关键词
Retard-bonded; Prestressed concrete; Beams and girders; Deflection; Creep;
D O I
暂无
中图分类号
学科分类号
摘要
This study compares the mechanical properties of the retard-bonded and conventionally bonded prestressed concrete (RBPC and BPC, respectively) under uniform loads. Results show that the prestressed strands and concrete of the RBPC T-beams are firmly bonded with harden of retard-bonded materials, thereby exhibiting the same mechanical properties as that of the BPC beams. The growth rate of the long-term deflections of the RBPC T-beam is slightly lower than that of the BPC T-beam. Given the effect of concrete shrinkage, creep and time variation of prestress loss, the regular patterns of deflection growth of the RBPC T-beam mid-spans are analysed based on the age-adjusted effective modulus method, method of equivalent prestress load and calculation model of prestress loss. Accordingly, the long-term deflection development curves of the RBPC T-beam mid-spans under self-weight, prestressing force and external loads are obtained. Calculation results are in good agreement with the test results. This method has immense applicability for the computation of the RBPC T-beams, and can be used to estimate the long-term deflection growth of regular patterns of the RBPC components.
引用
收藏
页码:887 / 895
页数:8
相关论文
共 41 条
[1]  
Li PX(2008)Research on the retard-bonded prestressed technique and development prospects Ind Constr 38 1-5
[2]  
Wshang RJ(2008)Experimental study on retard-bonded prestressed concrete beams in bending Ind Constr 38 24-27
[3]  
Zhang Q(2010)Finite element analysis of concrete structures using plastic-damage model in 3-D implementation Int J Civil Eng 8 187-203
[4]  
Zhou JF(2000)Long-term deflection prediction of concrete members reinforced with glass fibre reinforced polymer bars Can J Civ Eng 27 890-898
[5]  
Zeng ZB(2017)Effect of expansive agent and temperature on the quality of pre-cast concrete products Int J Civil Eng 23 90-93
[6]  
Omidi O(2001)Text study on retarded adhesive prestressed concrete component J China Railw Soc 139 814-823
[7]  
Lotfi V(2012)Relaxation of prestressing steel at varying strain and temperature: viscoplastic constitutive relation J Eng Mech ASCE 256 769-774
[8]  
Hall T(2017)Performance of the prestressed composite lining of a tunnel: case study of the yellow river crossing tunnel Int J Civil Eng 639 211-255
[9]  
Ghali A(2013)Ultimate bearing capacity test of retard-bonded prestressed concrete T-beams Appl Mech Mater 163–167 1431-1435
[10]  
Maruyama T(2013)Experimental research on crack width of retard-bonded partially prestressed concrete beams Adv Mater Res 24 95-99