The implementation and evaluation of Total Productive Maintenance (TPM)—an action case study in a Hong Kong manufacturing company

被引:2
作者
Hongyi Sun
Richard Yam
Ng Wai-Keung
机构
[1] City University of Hong Kong,Department of Manufacturing Engineering and Engineering Management
来源
The International Journal of Advanced Manufacturing Technology | 2003年 / 22卷
关键词
Total Productive Maintenance; Advanced Manufacturing Technology; Case Study;
D O I
暂无
中图分类号
学科分类号
摘要
This paper records the pilot implementation and evaluation of Total Productivity Maintenance (TPM) in the advanced manufacturing environment of a Hong Kong Manufacturing company. The management of the company would like to implement TPM in the company. However, many people doubt whether the project will succeed. The main concerns are: 1) TPM is a Japanese method. 2) The method may not be suitable for people in Hong Kong. Therefore, the company decided to have a pilot test in an advanced model machine. The pilot project turned out to be very successful. The experiences from this will be useful for the company to apply to all manufacturing. It can also be a reference for other companies that would like to implement TPM.
引用
收藏
页码:224 / 228
页数:4
相关论文
共 7 条
  • [1] Ben-Daya undefined(1995)undefined J Qual Maint Engin 1 20-undefined
  • [2] Jonsson undefined(1997)undefined J Qual Maint Engin 3 233-undefined
  • [3] Jostes undefined(1994)undefined Work Stud 43 18-undefined
  • [4] Raouf undefined(1994)undefined Int J Oper Prod Manage 14 44-undefined
  • [5] Seiichi undefined(1989)undefined TPM development programs implementing-undefined
  • [6] Sherwin undefined(1995)undefined J Qual iMaint Engin 1 15-undefined
  • [7] Wireman undefined(1991)undefined Total productive maintenance an-undefined