共 34 条
[1]
Boddy A(1999)Overview and Sensitivity Study of a Multimechanistic Chloride Transport Model[J] Cement and Concrete Research 29 827-837
[2]
Bentz E(1994)Prediction of Long Term Chloride Concentration in Concrete[J] Materiaux et Constructions 27 338-346
[3]
Thomas MDA(2010)On the Time Dependency of the Chloride Migration Coefficient in Concrete[J] Construction and Building Materials 24 396-402
[4]
Mangat PS(2008)Engineering Expression of the ClinConc Model for Prediction of Free and Total Chloride Ingress in Submerged Marine Concrete[J] Cement and Concrete Research 38 1 092-1097
[5]
Molloy BT(2010)Prediction of Time Dependent Chloride Transport in Concrete Structures Exposed to a Marine Environment[J] Cement and Concrete Research 40 302-312
[6]
Audenaert K(1996)Service Life Prediction of Existing Concrete Structures Exposed to Marine Environment[J] ACI Materials Journal 93 602-608
[7]
Yuan Q(1992)Rapid Determination of the Chloride Diffusivity in Concrete by Applying an Electrical Field[J] ACI Materials Journal 89 40-53
[8]
Schutter G De(2007)On the Mathematics of Time-dependent Apparent Chloride Diffusion Coefficient in Concrete[J] Cement and Concrete Research 37 589-595
[9]
Luping T(2009)Models for Chloride Ingress into Concrete-From Collepardi to today. International Journal of Modelling[J] Identification and Control 7 129-134
[10]
Pack SW(1988)Quality and Cover Thickness of Concrete Based on the Estimation of Chloride Penetration in Marine Environments[J] ACI Materials Journal 109 381-400