Numerical study on the CRLD cable–rock interaction under static pull-out loading using coupled DEM–FDM method

被引:0
作者
Z. H. Li
J. Hu
H. X. Zhu
J. L. Feng
M. C. He
机构
[1] Yango University,Department of Civil Engineering
[2] China University of Mining and Technology (Beijing),Navier Laboratory
[3] Ecole des Ponts Paris Tech,undefined
来源
Acta Geotechnica | 2020年 / 15卷
关键词
Cable–rock interaction; Coupled DEM–FDM method; CRLD cable; Numerical simulation; Pull-out strength; Static pull-out test;
D O I
暂无
中图分类号
学科分类号
摘要
As an effective energy-absorbing cable, constant resistance large deformation (CRLD) cables have been widely applied in rock engineering projects; however, to the best of our knowledge, its interaction mechanism with the surrounding rock has never been studied. According to previous practical projects, the CRLD cable–rock interaction differs from that of conventional cables because of the tubular expansion during the CRLD process, and it influences the performance of the cable reinforcement system. Therefore, an attempt was made to investigate the characteristics of the CRLD cable–rock interaction under static pull-out loading by using a coupled numerical method. The structure of the CRLD cable was modelled via the finite-difference method, and the surrounding rock was modelled via the discrete-element method. The micro-parameters of the surrounding rock were carefully calibrated, and the macro-parameters of the CRLD cable were verified by comparing them with a corresponding experimental test in the laboratory. The numerical results were carefully analysed. The constant resistance forces of a single CRLD cable and a CRLD cable reinforcement system were compared. The distribution of the normal and shearing stresses on the cable–rock interface was obtained, and the evolution mode of the pull-out strength was examined. In addition, the failure mode of the grouting material and surrounding rock was studied on a micro-scale. The findings describe the interaction of the CRLD cable against the surrounding rock, reveal its special anchorage mechanism, and can be used to predict and improve the performance of the CRLD cable reinforcement system.
引用
收藏
页码:2137 / 2158
页数:21
相关论文
共 61 条
  • [1] Blanco Martín L(2013)Assessment of the bolt-grout interface behaviour of fully grouted rockbolts from laboratory experiments under axial loads Int J Rock Mech Min Sci 63 50-61
  • [2] Tijani M(2004)A rock bolt and rock mass interaction model Int J Rock Mech Min Sci 41 1055-1067
  • [3] Hadj-Hassen F(1979)A discrete numerical model for granular assemblies Geothechnique 29 331-336
  • [4] Noiret A(1989)General report: deformation, yield, rupture and stability of excavations at depth in rock Am J Gastroenterol 98 S40-S40
  • [5] Cai Y(1975)Stress distribution along a resin grouted rock anchor Int J Rock Mech Min Sci Geomech Abstr 12 347-351
  • [6] Esaki T(2009)Real-time remote monitoring and foresting system for geological disasters and its engineeringapplication Chin J Rock Mech Eng 28 1081-1090
  • [7] Jiang Y(2014)Mechanical property and engineering application of anchor bolt with constant resistance and large deformation Chin J Rock Mech Eng 33 1297-1308
  • [8] Cundall PA(2014)Development of a novel energy-absorbing bolt with extraordinarily large elongation and constant resistance Int J Rock Mech Min Sci 67 29-42
  • [9] Strack ODL(2016)Support principles of NPR bolts/cables and control techniques of large deformation Chin J Rock Mech Eng 35 1513-1529
  • [10] Fairhurst C(2017)Dynamic tests for a Constant-Resistance-Large-Deformation bolt using a modified SHTB system Tunn Undergr Space Technol 64 103-116