A discrete PSO for two-stage assembly scheduling problem

被引:6
作者
Ye Tian
Dayou Liu
Donghui Yuan
Kunhao Wang
机构
[1] Changchun University of Science and Technology,School of Computer Science and Technology
[2] Jilin University,College of Computer Science and Technology, Key Laboratory of Symbolic Computation and Knowledge Engineering of Ministry of Education
[3] The First Flying College of Airforce,undefined
来源
The International Journal of Advanced Manufacturing Technology | 2013年 / 66卷
关键词
Two-stage assembly scheduling problem; Combinatorial optimization; Particle swarm optimization; Local search; Makespan; Mean completion time; Setup times;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, a discrete particle swarm optimization (PSO) algorithm called DPSO is proposed to solve the two-stage assembly scheduling problem with respect to bicriteria of makespan and mean completion time where setup times are treated as separate from processing times. In DPSO, the particle velocity representation is redefined, and particle movement is modified accordingly. In order to refrain from the shortcoming of premature convergence, individual intensity is defined, which is used to control adaptive mutation of the particle, and mutation mode is decided by the individual fitness. Furthermore, a randomized exchange neighborhood search is introduced to enhance the local search ability of the particle and increase the convergence speed. Finally, the proposed algorithm is tested on different scale problems and compared with the proposed efficient algorithms in the literature recently. The results show that DPSO is an effective and efficient for assembly scheduling problem.
引用
收藏
页码:481 / 499
页数:18
相关论文
共 50 条
  • [41] Solving the two-stage hybrid flow shop scheduling problem based on mutant firefly algorithm
    Fan, Beibei
    Yang, Wenwei
    Zhang, Zaifang
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (03) : 979 - 990
  • [42] Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect
    Zou, Yunqing
    Wang, Dujuan
    Lin, Win-Chin
    Chen, Jia-Yang
    Yu, Pay-Wen
    Wu, Wen-Hsiang
    Chao, Yuan-Po
    Wu, Chin-Chia
    SOFT COMPUTING, 2020, 24 (07) : 5445 - 5462
  • [43] Two-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effect
    Yunqing Zou
    Dujuan Wang
    Win-Chin Lin
    Jia-Yang Chen
    Pay-Wen Yu
    Wen-Hsiang Wu
    Yuan-Po Chao
    Chin-Chia Wu
    Soft Computing, 2020, 24 : 5445 - 5462
  • [44] A two-stage real world serial batching scheduling problem: a case study
    Karakutuk, Sadik Serhat
    Akpinar, Sener
    Ornek, Mustafa Arslan
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2024, 75 (12) : 2392 - 2403
  • [45] The optimal number of used machines in a two-stage flexible flowshop scheduling problem
    Gerstl, Enrique
    Mosheiov, Gur
    JOURNAL OF SCHEDULING, 2014, 17 (02) : 199 - 210
  • [46] Two-Stage Flow-Open Shop Scheduling Problem to Minimize Makespan
    Ren, Tao
    Liu, Bingqian
    Zhao, Peng
    Yuan, Huawei
    Li, Haiyan
    Bai, Danyu
    INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 527 - 535
  • [47] The optimal number of used machines in a two-stage flexible flowshop scheduling problem
    Enrique Gerstl
    Gur Mosheiov
    Journal of Scheduling, 2014, 17 : 199 - 210
  • [48] Robust scheduling for a two-stage assembly shop with scenario-dependent processing times
    Wu, Chin-Chia
    Gupta, Jatinder N. D.
    Cheng, Shuenn-Ren
    Lin, Bertrand M. T.
    Yip, Siu-Hung
    Lin, Win-Chin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (17) : 5372 - 5387
  • [49] Application of an effective modified gravitational search algorithm for the coordinated scheduling problem in a two-stage supply chain
    Pei, Jun
    Liu, Xinbao
    Pardalos, Panos M.
    Fan, Wenjuan
    Yang, Shanlin
    Wang, Ling
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4) : 335 - 348
  • [50] A Branch and Bound Algorithm for Minimizing Total Tardiness of a Two-Stage Assembly Problem
    Luo, JianChao
    Xu, Jun
    39TH YOUTH ACADEMIC ANNUAL CONFERENCE OF CHINESE ASSOCIATION OF AUTOMATION, YAC 2024, 2024, : 1064 - 1067