A discrete PSO for two-stage assembly scheduling problem

被引:6
|
作者
Ye Tian
Dayou Liu
Donghui Yuan
Kunhao Wang
机构
[1] Changchun University of Science and Technology,School of Computer Science and Technology
[2] Jilin University,College of Computer Science and Technology, Key Laboratory of Symbolic Computation and Knowledge Engineering of Ministry of Education
[3] The First Flying College of Airforce,undefined
来源
The International Journal of Advanced Manufacturing Technology | 2013年 / 66卷
关键词
Two-stage assembly scheduling problem; Combinatorial optimization; Particle swarm optimization; Local search; Makespan; Mean completion time; Setup times;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, a discrete particle swarm optimization (PSO) algorithm called DPSO is proposed to solve the two-stage assembly scheduling problem with respect to bicriteria of makespan and mean completion time where setup times are treated as separate from processing times. In DPSO, the particle velocity representation is redefined, and particle movement is modified accordingly. In order to refrain from the shortcoming of premature convergence, individual intensity is defined, which is used to control adaptive mutation of the particle, and mutation mode is decided by the individual fitness. Furthermore, a randomized exchange neighborhood search is introduced to enhance the local search ability of the particle and increase the convergence speed. Finally, the proposed algorithm is tested on different scale problems and compared with the proposed efficient algorithms in the literature recently. The results show that DPSO is an effective and efficient for assembly scheduling problem.
引用
收藏
页码:481 / 499
页数:18
相关论文
共 50 条
  • [1] A discrete PSO for two-stage assembly scheduling problem
    Tian, Ye
    Liu, Dayou
    Yuan, Donghui
    Wang, Kunhao
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (1-4) : 481 - 499
  • [2] A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
    Allahverdi, A
    Al-Anzi, FS
    COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (04) : 1056 - 1080
  • [3] A two-stage PSO algorithm for job shop scheduling problem
    Pratchayaborirak, Thongchai
    Kachitvichyanukul, Voratas
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2011, 6 (02) : 83 - 92
  • [4] TWO-STAGE ASSEMBLY FLOWSHOP SCHEDULING PROBLEM WITH MAXIMUM LATENESS AND MAKESPAN
    Allahverdi, All
    Al-Anzi, Fawaz S.
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2021 - 2028
  • [5] A competitive memetic algorithm for the distributed two-stage assembly flow-shop scheduling problem
    Deng, Jin
    Wang, Ling
    Wang, Sheng-yao
    Zheng, Xiao-long
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (12) : 3561 - 3577
  • [6] Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
    Allahverdi, Ali
    Al-Anzi, Fawaz S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) : 4713 - 4735
  • [7] Two-stage assembly scheduling problem for minimizing total tardiness with setup times
    Allahverdi, Ali
    Aydilek, Harlin
    Aydilek, Asiye
    APPLIED MATHEMATICAL MODELLING, 2016, 40 (17-18) : 7796 - 7815
  • [8] The two-stage assembly scheduling problem to minimize total completion time with setup times
    Allahverdi, Ali
    Al-Anzi, Fawaz S.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (10) : 2740 - 2747
  • [9] A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness
    Lee, Ju-Yong
    Bang, June-Young
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
  • [10] The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time
    Ali Allahverdi
    Fawaz S. Al-Anzi
    The International Journal of Advanced Manufacturing Technology, 2008, 37 : 166 - 177