Investigation of the Extraction of the Casing for Large Diameter Cast-in-Place Piles by Vibratory Hammers in Clays

被引:3
作者
Dong Y.Z. [1 ]
Chen F.Q. [1 ]
Chen Y.K. [2 ]
机构
[1] College of Civil Engineering, Fuzhou University, No. 2 Xueyuan Road, Shangjie University Town, Fuzhou
[2] School of Civil Engineering and Transportation, South China University of Technology, 381 Wushan Rd., TianHe District, Guangzhou
基金
中国国家自然科学基金;
关键词
Benoto pile; Casing extraction; Coupled Eulerian–Lagrangian method; High frequency vibration; Large deformation;
D O I
10.1007/s40098-017-0256-4
中图分类号
学科分类号
摘要
The Benoto cast-in-place piles are widely used in civil engineering for having the advantage of producing low vibration and noise. Therefore, more researches are needed to fully understand its mechanism. However, the researches on the mechanism of Benoto piles are only limited to the driving stage, the study of extraction stage of the steel casing is not comprehensive. In this paper, a three-dimensional numerical model was developed by Coupled Eulerian–Lagrangian method. The mechanism of high-frequency vibratory extraction of casing was studied in detail. The result indicates that the vibratory casing extraction process can be divided into two stages, namely the slow and fast extraction stage. During the vibratory casing extraction process, the soil displacement, stresses, void ratio and excess pore water pressure abruptly change in the soils around the casing bottom. Furthermore, the influence of vibratory hammers on vibratory casing extraction was investigated. The change in the excitation frequency and excitation force has effect on casing extraction speed and soil particle velocity, but hardly has any influence on soil displacement and stresses. © 2017, Indian Geotechnical Society.
引用
收藏
页码:430 / 441
页数:11
相关论文
共 19 条
[1]  
Burland J.B., Piling and deep foundations: proceedings of the international conference on piling and deep foundations, (1989)
[2]  
Chen F.Q., Wang J.W., Li D.Y., Application and advance of vibratory driving techniques using high-frequency hydraulic vibratory hammer, Chin J Geotech Eng, 33, S2, pp. 224-231, (2011)
[3]  
Xiao Y.J., Chen F.Q., Dong Y.Z., Numerical investigation of soil plugging effect inside sleeve of cast-in-place piles driven by vibratory hammers in clays, SpringerPlus, 5, 1, pp. 1-19, (2016)
[4]  
Hamann T., Qiu G., Jurgen G., Application of a coupled Eulerian–Lagrangian approach on pile installation problems under partially drained conditions, Comput Geotech, 63, pp. 279-290, (2015)
[5]  
Henke S., Full-Scale Site Investigations on Soil-Plugging Inside Tubular Piles, ASME 2012 31St International Conference on Ocean, Offshore and Arctic Engineering, (2012)
[6]  
Nie Q.K., Hu J.M., Shang W.D., Disturbance effect on soft clay foundation due to steel tube driving by use of shaking method, Chin J Geotech Eng, 30, 1, pp. 128-132, (2008)
[7]  
Wu Y.D., Liu J., Ng C.W.W., Effects of pile extraction and refilling with cement slurry on ground settlements, Can Geotech J, 50, 3, pp. 343-349, (2013)
[8]  
Tseitlin M.G., Kosheleva A.A., Vibratory embedment of long piles and tubes and their extraction, Soil Mech Found Eng, 21, 3, pp. 112-117, (1984)
[9]  
Qiu G., Henke S., Jurgen G., Applications of coupled Eulerian–Lagrangian method to geotechnical problems with large deformations, Proceeding of SIMULIA Customer Conference, (2009)
[10]  
Henke S., Jurgen G., Numerical investigation of soil plugging inside open-ended piles with respect to the installation method, Acta Geotech, 3, 3, pp. 215-223, (2008)