A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan

被引:0
作者
Yan He
Fei Liu
Hua-jun Cao
Cong-bo Li
机构
[1] Chongqing University,Institute of Green Manufacturing Technology
来源
Journal of Central South University of Technology | 2005年 / 12卷
关键词
green manufacturing; job-shop scheduling; tabu search; energy-saving; TH186;
D O I
暂无
中图分类号
学科分类号
摘要
The issue of reducing energy consumption for the job-shop scheduling problem in machining systems is addressed, whose dual objectives are to minimize both the energy consumption and the makespan. First, the biobjective model for the job-shop scheduling problem is proposed. The objective function value of the model represents synthesized optimization of energy consumption and makespan. Then, a heuristic algorithm is developed to locate the optimal or near optimal solutions of the model based on the Tabu search mechanism. Finally, the experimental case is presented to demonstrate the effectiveness of the proposed model and the algorithm.
引用
收藏
页码:167 / 171
页数:4
相关论文
共 50 条
[31]   Genetic Algorithm for Solving Job-Shop Scheduling Problem [J].
Li XiaoBo .
2011 INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND NEURAL COMPUTING (FSNC 2011), VOL IV, 2011, :296-298
[32]   A genetic algorithm for the Flexible Job-shop Scheduling Problem [J].
Pezzella, F. ;
Morganti, G. ;
Ciaschetti, G. .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (10) :3202-3212
[33]   Genetic Algorithm for Solving Job-Shop Scheduling Problem [J].
Li XiaoBo .
2011 AASRI CONFERENCE ON INFORMATION TECHNOLOGY AND ECONOMIC DEVELOPMENT (AASRI-ITED 2011), VOL 1, 2011, :296-298
[34]   A novel algorithm for solving job-shop scheduling problem [J].
Muthiah, A. ;
Rajkumar, R. .
MECHANIKA, 2017, 23 (04) :610-616
[35]   A NEW LOWER BOUND FOR THE JOB-SHOP SCHEDULING PROBLEM [J].
BRUCKER, P ;
JURISCH, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) :156-167
[36]   Minimizing the worst-case makespan for a job-shop scheduling system with uncertain processing times [J].
Liu, Lijia ;
Wang, Bing ;
Li, Xiaoyan .
2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, :6993-6998
[37]   A multi-objective PSO for job-shop scheduling problems [J].
Sha, D. Y. ;
Lin, Hsing-Hung .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (02) :1065-1070
[38]   A Multi-objective PSO for Job-shop Scheduling Problems [J].
Sha, D. Y. ;
Lin, H. H. .
CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, :489-+
[39]   Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time [J].
Liu, Runze ;
Jia, Qi ;
Yu, Hui ;
Gao, Kaizhou ;
Fu, Yaping ;
Yin, Li .
MATHEMATICS, 2025, 13 (03)
[40]   Scatter search algorithm for the multiprocessor task job-shop scheduling problem [J].
Fan, Kun ;
Wang, Meng ;
Zhai, Yafei ;
Li, Xinning .
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 :677-686