Fuzzy multi-objective optimization for multi-site integrated production and distribution planning in two echelon supply chain

被引:0
作者
Gaurav Kumar Badhotiya
Gunjan Soni
M. L. Mittal
机构
[1] Malaviya National Institute of Technology Jaipur,Department of Mechanical Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2019年 / 102卷
关键词
Multi-site manufacturing; Production planning; Distribution planning; Fuzzy multi-objective programming; Optimization;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses an integrated production and distribution planning problem for a two-echelon supply chain network comprising of multiple manufacturers serving multiple selling locations. A novel fuzzy multi-objective mixed integer programming model is formulated considering multi-product, multi-period, and multi-site manufacturing environment. Minimization of total cost, delivery time, and backorder level are the three fuzzy objectives represented by piecewise linear membership function. Three important production and distribution aspects viz. capacity of the heterogeneous transportation, backordering for unfulfilled demand, and set-up cost/time for different products at manufacturing site are incorporated in an integrated manner to represent closeness to the real-life problem. An illustrative example inspired from a real-world case of an automobile industry is taken to demonstrate analytical results of the proposed approach. The outcome of the research indicates the practical applicability of the approach. Sensitivity analysis on objective function values is conducted for analyzing the effect of change in aspiration levels of objective function values on decision maker’s satisfaction level.
引用
收藏
页码:635 / 645
页数:10
相关论文
共 123 条
[21]  
Wadhwa S(1965)Information and control Fuzzy Sets 8 338-353
[22]  
Lei L(1976)Description and optimization of fuzzy systems Int J Gen Syst 2 209-215
[23]  
Liu S(1970)Decision-making in a fuzzy environment Manag Sci 17 B-141-55
[24]  
Ruszczynski A(1978)Fuzzy programming and linear programming with several objective functions Fuzzy Sets Syst 1 45-248
[25]  
Park S(1981)Linear programming with multiple fuzzy goals Fuzzy Sets Syst 6 235-420
[26]  
Alemany MM(2009)Quantitative models for supply chain planning under uncertainty: a review Int J Adv Manuf Technol 43 400-5
[27]  
Boj JJ(2001)Fuzzy programming and profit and cost allocation for a production and transportation problem Eur J Oper Res 131 1-34
[28]  
Mula J(1999)Fuzzy sets as a basis for a theory of possibility Fuzzy Sets Syst 100 9-1050
[29]  
Lario FC(2008)Modeling of a blending and marine transportation planning problem with fuzzy mixed-integer programming Int J Adv Manuf Technol 36 1041-4495
[30]  
H'Mida F(2010)Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem Expert Syst Appl 37 4488-5429