Fuzzy multi-objective optimization for multi-site integrated production and distribution planning in two echelon supply chain

被引:0
作者
Gaurav Kumar Badhotiya
Gunjan Soni
M. L. Mittal
机构
[1] Malaviya National Institute of Technology Jaipur,Department of Mechanical Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2019年 / 102卷
关键词
Multi-site manufacturing; Production planning; Distribution planning; Fuzzy multi-objective programming; Optimization;
D O I
暂无
中图分类号
学科分类号
摘要
This paper addresses an integrated production and distribution planning problem for a two-echelon supply chain network comprising of multiple manufacturers serving multiple selling locations. A novel fuzzy multi-objective mixed integer programming model is formulated considering multi-product, multi-period, and multi-site manufacturing environment. Minimization of total cost, delivery time, and backorder level are the three fuzzy objectives represented by piecewise linear membership function. Three important production and distribution aspects viz. capacity of the heterogeneous transportation, backordering for unfulfilled demand, and set-up cost/time for different products at manufacturing site are incorporated in an integrated manner to represent closeness to the real-life problem. An illustrative example inspired from a real-world case of an automobile industry is taken to demonstrate analytical results of the proposed approach. The outcome of the research indicates the practical applicability of the approach. Sensitivity analysis on objective function values is conducted for analyzing the effect of change in aspiration levels of objective function values on decision maker’s satisfaction level.
引用
收藏
页码:635 / 645
页数:10
相关论文
共 123 条
[1]  
Torabi SA(2012)Multi-site integrated production-distribution planning with trans-shipment: a fuzzy goal programming approach Int J Prod Res 50 1726-1748
[2]  
Moghaddam M(2001)Multi-site planning: a transshipment problem Int J Prod Econ 74 21-32
[3]  
Guinet A(2002)Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain Comput Ind Eng 43 331-349
[4]  
Moon C(2009)Integrating production and transportation scheduling in a two-stage supply chain considering order assignment Int J Adv Manuf Technol 44 928-939
[5]  
Kim J(2018)Integrated production-distribution planning problem in a competition-based four-echelon supply chain Comput Ind Eng 119 85-99
[6]  
Hur S(2013)A review and critique on integrated production–distribution planning models and techniques J Manuf Syst 32 1-9
[7]  
Zegordi SH(2018)An analysis of mathematical models for multi-site production and distribution planning Int J Intell Enterp 5 309-332
[8]  
Nia MA(2005)A hybrid genetic algorithm for production and distribution Omega 33 345-355
[9]  
Rafiei H(2006)On the integrated production, inventory, and distribution routing problem IIE Trans 38 955-970
[10]  
Safaei F(2010)Mathematical programming model for centralised master planning in ceramic tile supply chains Int J Prod Res 48 5053-5074