Effectiveness and Efficiency of Scheduling Regional Water Resources Projects

被引:0
作者
Frederick N.-F. Chou
Hao-Chih Lee
William W.-G. Yeh
机构
[1] National Cheng Kung University,Department of Hydraulic and Ocean Engineering
[2] University of California,Department of Civil and Environmental Engineering
来源
Water Resources Management | 2013年 / 27卷
关键词
Water resources development; Project scheduling; Binary dynamic programming; Network flow programming;
D O I
暂无
中图分类号
学科分类号
摘要
The regional water resources planning contains a variety of proposed projects. Precisely estimating the regional system yield could be difficult. Incorrectly computed system yield will cause the scheduling strategy to be not correctly screened. This research imbedded a combined regional simulation-optimization model, namely Generalized Water Allocation Simulation Model (GWASIM), for evaluating system yield in binary dynamic programming (DP) analysis as a scheduling model to determine the optimal development strategy of the master plan of a regional water supply system. To achieve a complete scheduling analysis, this paper investigated: (1) applying GWASIM to effectively and efficiently determine the precise system yields of many different combinations of proposed projects while meeting design criteria of acceptable shortage; (2) solving a non-pure sequencing problem with a DP based scheduling model since some projects may not be necessarily developed, or even no feasible combination of proposed projects can meet the demand; (3) clarifying the amortized construction cost to be accounted in economic analysis if the economic life of a project exceeds the scheduling horizon. In addition, the computation efficiencies of scheduling analysis and system yield analysis, which are significantly improved with DP and simulation-optimization model respectively, are discussed in the paper. This study devised the master plan of the Jilong river system in northern Taiwan as an example. The optimal scheduling strategy of minimum developing cost was precisely determined.
引用
收藏
页码:665 / 693
页数:28
相关论文
共 73 条
[1]  
Becker L(1974)Timing and sizing of complex water resource systems J Hydraul Div 100 1457-1470
[2]  
Yeh WWG(1985)Capacity expansion of Sao Paulo water supply J Water Resour Plan Manage 111 238-252
[3]  
Braga BPF(1969)Dynamic programming for the optimal sequencing of water supply projects Water Resour Res 5 1196-1204
[4]  
Conejo JGL(2009)Optimizing system capacity expansion schedules for groundwater supply Water Resour Res 45 W07407-157
[5]  
Becker L(2010)Reducing the impacts of flood-induced reservoir turbidity on a regional water supply system Adv Water Resour 33 146-305
[6]  
Yeh WWG(2001)River basin network model for integrated water quantity/quality management J Water Resour Plan Manage 127 295-347
[7]  
Butcher WS(1972)Chance constrained reservoir model Water Resour Res 8 339-329
[8]  
Haimes YY(1998)Cost-effectiveness analyses of Libya’s water supply system J Water Resour Plan Manage 124 320-553
[9]  
Hall WA(1973)Sequencing expansion projects Oper Res 21 542-181
[10]  
Chang LC(1970)Markov models for flow regulation J Hydraul Div 96 165-4071