共 95 条
[1]
Agnetis A(1997)Concurrent operations assignment and sequencing for particular assembly problems in flow lines Ann Oper Res 69 1-31
[2]
Arbib C(2011)A review of the current applications of genetic algorithms in mixed-model assembly line sequencing Int J Prod Res 49 4483-4503
[3]
Akgündüz OS(2008)Balancing and scheduling tasks in assembly lines with sequence-dependent setup times Eur J Oper Res 187 1212-1223
[4]
Tunalı S(1997)A parallel station heuristic for the mixed-model production line balancing problem Int J Prod Res 35 3095-3106
[5]
Andres C(2006)A survey on problems and methods in generalized assembly line balancing Eur J Oper Res 168 694-715
[6]
Miralles C(2009)Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure Eur J Oper Res 199 359-374
[7]
Pastor R(2008)Assembly line balancing: which model to use when Int J Prod Econ 111 509-528
[8]
Askin RG(2009)Sequencing mixed-model assembly lines: survey, classification and model crituqe Eur J Oper Res 192 349-773
[9]
Zhou M(2009)Production planning of mixed-model assembly lines: overview and extensions Prod Plan Control 20 455-471
[10]
Backer C(2003)A weighted approach for assembly line design with station paralleling and equipment selection IIE Trans 35 73-85