Balancing and scheduling of flexible mixed model assembly lines with parallel stations

被引:0
作者
Cemalettin Öztürk
Semra Tunalı
Brahim Hnich
Arslan Örnek
机构
[1] İzmir University of Economics,Department of Industrial Systems Engineering
[2] İzmir University of Economics,Department of Business Administration
[3] İzmir University of Economics,Department of Computer Engineering
来源
The International Journal of Advanced Manufacturing Technology | 2013年 / 67卷
关键词
Mixed model assembly lines; Balancing; Scheduling; Flexible manufacturing; Mixed integer programming;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we study flexible mixed model assembly lines with serially connected stages where stages may have one or more parallel stations. Station parallelism in flexible mixed model assembly lines improves system reliability and enables rapid adaptability to customer demand fluctuations. However, in order to effectively manage such lines under real-world conditions, there is a need to extend traditional assembly line management methods. This study extends the current research by simultaneously considering the problems of task assignment and model scheduling on parallel stations. Furthermore, scheduling of assigned tasks on each station is considered. We formulate the problem context first as a mixed integer programming model and then develop a decomposition scheme for large scale applications. Finally, we compare the performance of the proposed model and decomposition scheme using various size test instances.
引用
收藏
页码:2577 / 2591
页数:14
相关论文
共 95 条
[1]  
Agnetis A(1997)Concurrent operations assignment and sequencing for particular assembly problems in flow lines Ann Oper Res 69 1-31
[2]  
Arbib C(2011)A review of the current applications of genetic algorithms in mixed-model assembly line sequencing Int J Prod Res 49 4483-4503
[3]  
Akgündüz OS(2008)Balancing and scheduling tasks in assembly lines with sequence-dependent setup times Eur J Oper Res 187 1212-1223
[4]  
Tunalı S(1997)A parallel station heuristic for the mixed-model production line balancing problem Int J Prod Res 35 3095-3106
[5]  
Andres C(2006)A survey on problems and methods in generalized assembly line balancing Eur J Oper Res 168 694-715
[6]  
Miralles C(2009)Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure Eur J Oper Res 199 359-374
[7]  
Pastor R(2008)Assembly line balancing: which model to use when Int J Prod Econ 111 509-528
[8]  
Askin RG(2009)Sequencing mixed-model assembly lines: survey, classification and model crituqe Eur J Oper Res 192 349-773
[9]  
Zhou M(2009)Production planning of mixed-model assembly lines: overview and extensions Prod Plan Control 20 455-471
[10]  
Backer C(2003)A weighted approach for assembly line design with station paralleling and equipment selection IIE Trans 35 73-85