共 208 条
[1]
Liu QS(2017)A case study of TBM performance prediction using a Chinese rock mass classification system—Hydropower classification (HC) method Tunn. Undergr. Space Technol. 65 140-154
[2]
Liu JP(2019)Estimation of ground pressures on a shielded TBM in tunnelling through squeezing ground and its possibility of jamming Bull. Eng. Geol. Env. 78 5237-5251
[3]
Pan YC(2010)Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method Tunn. Undergr. Space Technol. 25 230-244
[4]
Kong XX(2016)Tunnel boring machines (TBMs) in difficult grounds Tunn. Undergr. Space Technol. 57 1-3
[5]
Hong KR(2016)TBM tunnelling under adverse geological conditions: An overview Tunn. Undergr. Space Technol. 57 4-17
[6]
Aydan Ö(2004)A case history of tunnel boring machine jamming in an inter-layer shear zone at the Yellow River Diversion Project in China Eng. Geol. 71 199-211
[7]
Hasanpour R(2017)Decision plots for preliminary design of single-shield TBMs Eng. Geol. 216 134-139
[8]
Cho JW(2012)Rock burst and slabbing failure and its influence on TBM excavation at headrace tunnels in Jinping II hydropower station Eng. Geol. 124 98-108
[9]
Jeon S(2019)Application and outlook of information and intelligence technology for safe and efficient TBM construction Tunn. Undergr. Space Technol. 93 103097-191
[10]
Yu SH(2020)Using machine learning approach for microseismic events recognition in underground excavations: Comparison of ten frequently-used models Eng. Geol. 268 105519-333