共 105 条
[1]
Wang Y(2020)Multi-objective optimization of rolling schedule for five-stand tandem cold mill IEEE Access 8 80417-80426
[2]
Wang J(2001)A setup model for tandem cold rolling mills J Mater Process Technol 116 269-277
[3]
Yin C(2000)Application of fuzzy set theory in the scheduling of a tandem cold-rolling mill J Manuf Sci Eng 122 494-500
[4]
Zhao Q(2000)Toward a heuristic optimum design of rolling schedules for tandem cold rolling mills Eng Appl Artif Intell 13 397-406
[5]
Reddy NV(2006)Set-up optimization for tandem cold mills: A case study J Mater Process Technol 173 368-375
[6]
Suryanarayana G(1969)Optimising theory of pass reduction schedules and some criterion functions J Jpn Soc Technol Plast 10 808-816
[7]
Dixit U(2005)Pass schedule optimization for a tandem cold mill IFAC Proc Vol 38 193-198
[8]
Dixit P(2009)Adaptation for tandem cold mill models J Mater Process Technol 209 3592-3596
[9]
Wang D(2010)Optimization-based automatic flatness control in cold tandem rolling J Process Control 20 396-407
[10]
Tieu AK(2010)Multi-objective optimization for tandem cold rolling schedule J Iron Steel Res Int 17 34-39