共 84 条
- [1] Azaron A.(2005)A genetic algorithm approach for the time-cost trade-off in PERT networks Applied Mathematics and Computation 168 1317-1339
- [2] Perkgoz C.(1967)Dynamic programming for project cost-time curve Journal of Construction Division 93 59-73
- [3] Sakawa M.(1981)The use of fuzzy variables in PERT Fuzzy Sets and Systems 5 11-19
- [4] Butcher W. S.(1959)Chance-constrained programming Management Science 6 73-79
- [5] Chanas S.(1962)A network interpretation and a direct sub-dual algorithm for critical path scheduling Journal of Industrial Engineering 13 213-219
- [6] Kamburowski J.(1997)A time-cost trade-off model with resource consideration using genetic algorithm Civil Engineering Systems 14 291-311
- [7] Charnes A.(2008)Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost Construction Management and Economics 26 679-691
- [8] Cooper W. W.(1997)Using genetic algorithms to solve construction time-cost trade-off problems Journal of Construction Engineering and Management 11 184-189
- [9] Charnes A.(1960)A generalized network approach to project activity sequencing IRE Transactions on Engineering Management 7 103-107
- [10] Cooper W. W.(2008)An application of possibility goal programming to the time-cost trade off problem Journal of Uncertain Systems 2 22-28