An investigation on dam settlement during and end of construction using instrumentation data and numerical analysis

被引:0
作者
Behrang Beiranvand
Mehdi Komasi
机构
[1] University of Ayatollah Ozma Borujerdi,Water Engineering, and Hydraulic Structures, Department of Civil Engineering, Faculty of Engineering
[2] University of Ayatollah Ozma Borujerdi,Water Engineering and Hydraulic Structure PH.D, Department of Civil Engineering, Faculty of Engineering
来源
SN Applied Sciences | 2021年 / 3卷
关键词
Settlement; Marvak earth dam; Instrumentation; Numerical analysis; End of construction;
D O I
暂无
中图分类号
学科分类号
摘要
In the present study, using instrumentation data regarding vertical and horizontal displacement of the dam have been analyzed. Also, the largest and most critical section of the Marvak earth dam is modeled with the behavioral model of the Mohr–Coulomb by GeoStudio software. Numerical modeling of the dam has been done considering the actual embankment conditions and to analyze the changes of the immediate settlement during construction and the consolidation settlement just after construction and initial impounding. The outcomes of instrumentation and numerical analysis at the end of Marvak dam construction showed a settlement between 20 and 500 mm. The results show that the settlement will occur during the construction at the upper levels and the end of construction at the middle levels of the dam. By comparing observed and predicted data, multivariate regression and the explanation coefficient criterion (R2) was found to be R2 = 0.9579, which shows a very good correlation between observed and predicted data, and represents a good match for the settlement points and their location with the initial conditions of the design, and the behavior of the dam in terms of the settlement is found to be stable.
引用
收藏
相关论文
共 22 条
  • [1] Clough RW(1967)Analysis of embankment stresses and deformations J Soil Mech Found Div ASCE 93 529-549
  • [2] Woodward RJ(2014)Numerical analysis of seepage in embankment dams J Mech Civ Eng 4 13-23
  • [3] Abhilasha PS(2017)Evaluation of behaviors of earth and rockfill dams during construction and initial impounding using instrumentation data and numerical modeling J Rock Mech Geotech Eng 9 709-725
  • [4] Balan TG(2018)Numerical analysis and monitoring of an embankment dam during construction and first impounding case study: Siah Sang Dam Sci Iran A 25 505-515
  • [5] Rashidi MS(2016)Assessment of observed behavior of Sidi El Barrak Dam (Tunisia) Innov Infrastruct Solut 1 34-44
  • [6] Haeri M(2018)Monitoring and characterizing the deformation of an earth dam in Guangxi Province, China Eng Geol 248 50-60
  • [7] Rashidi M(2019)A modified valley shape factor for the estimation of rockfill dam settlement Comput Geotech 108 244-256
  • [8] Haeri M(2006)Buoyancy and local friction effects on rockfill settlements: discrete modeling Comput Math Appl 55 208-217
  • [9] Azizyan Gh(undefined)undefined undefined undefined undefined-undefined
  • [10] Karoui H(undefined)undefined undefined undefined undefined-undefined