Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs

被引:0
作者
Pedro Belluco Macedo
Douglas Alem
Maristela Santos
Muris Lage Junior
Alfredo Moreno
机构
[1] Oracle do Brasil Sistemas Ltda,Production Engineering Department
[2] Federal University of São Carlos,Instituto de Ciências Matemáticas e de Computação
[3] University of São Carlos,Production Engineering Department
[4] Federal University of São Carlos,undefined
来源
The International Journal of Advanced Manufacturing Technology | 2016年 / 82卷
关键词
Lot sizing; Remanufacturing; Two-stage stochastic programming; Risk aversion; Mean risk;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents mixed-integer programming models to hybrid manufacturing and remanufacturing lot-sizing problems in which remanufactured products are treated as new ones, so that both manufactured and remanufactured products compete to meet the demands. Differently from previous studies, we consider an environment with multiple products, both manufacturing and remanufacturing costs, disposal, backlogging, and the inherent uncertainties of demands, return rates of usable products, and setup costs. In order to deal with these uncertainties, we propose a scenario-based two-stage stochastic programming model that assumes production and setup as first-stage decision variables, whereas inventory, disposal, and backlogging are defined as second-stage decision variables. We also analyze a risk-averse model in an attempt to reduce the dispersion of the second-stage costs. The main results of the present study indicate that setup costs for remanufacturing can be decisive in choosing between manufacturing or remanufacturing. Even though remanufacturing costs are lower, the process is still largely dependent on return rates and low storage costs for returned products.
引用
收藏
页码:1241 / 1257
页数:16
相关论文
共 115 条
[1]  
Wang J(2011)Optimum policy in hybrid manufacturing/remanufacturing system Comput Ind Eng 60 411-419
[2]  
Zhao J(2014)A review of the state of the art in tools and techniques used to evaluate remanufacturing feasibility J Clean Prod 81 1-15
[3]  
Wang X(2011)Implementing extended producer responsibility: vehicle remanufacturing in china J Clean Prod 19 680-686
[4]  
Goodall P(2011)Sustainability through remanufacturing in India: a case study on mobile handsets J Clean Prod 19 1709-1722
[5]  
Rosamond E(2003)Remanufacturing: the next great opportunity for boosting us productivity Bus Horiz 46 41-48
[6]  
Harding J(2011)An analysis of remanufacturing practices in Japan J Remanuf 1 1-11
[7]  
Xiang W(2013)Remanufacturing in Brazil: case studies on the automotive sector J Clean Prod 53 267-276
[8]  
Ming C(2010)A stochastic model for forward–reverse logistics network design under risk Comput Ind Eng 58 423-431
[9]  
Rathore P(2013)Pricing and production planning for reverse supply chain: a review Int J Prod Res 51 6972-6989
[10]  
Kota S(2006)Dynamic performance of a hybrid inventory system with a kanban policy in remanufacturing process Omega 34 585-598