Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs

被引:0
|
作者
Carman K. M. Lee
Danping Lin
William Ho
Zhang Wu
机构
[1] Nanyang Technological University,Division of Systems and Engineering Management, School of Mechanical and Aerospace Engineering
[2] Aston University,Operations and Information Management Group, Aston Business School
来源
The International Journal of Advanced Manufacturing Technology | 2011年 / 56卷
关键词
Bi-objective; Re-entrant; Genetic algorithm; Flow shop;
D O I
暂无
中图分类号
学科分类号
摘要
This paper presents a simulated genetic algorithm (GA) model of scheduling the flow shop problem with re-entrant jobs. The objective of this research is to minimize the weighted tardiness and makespan. The proposed model considers that the jobs with non-identical due dates are processed on the machines in the same order. Furthermore, the re-entrant jobs are stochastic as only some jobs are required to reenter to the flow shop. The tardiness weight is adjusted once the jobs reenter to the shop. The performance of the proposed GA model is verified by a number of numerical experiments where the data come from the case company. The results show the proposed method has a higher order satisfaction rate than the current industrial practices.
引用
收藏
页码:1105 / 1113
页数:8
相关论文
共 50 条
  • [1] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [2] Bi-objective scheduling for the re-entrant hybrid flow shop with learning effect and setup times
    Mousavi, S. M.
    Mahdavi, I
    Rezaeian, J.
    Zandieh, M.
    SCIENTIA IRANICA, 2018, 25 (04) : 2233 - 2253
  • [3] An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times
    S. M. Mousavi
    I. Mahdavi
    J. Rezaeian
    M. Zandieh
    Operational Research, 2018, 18 : 123 - 158
  • [4] An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times
    Mousavi, S. M.
    Mahdavi, I.
    Rezaeian, J.
    Zandieh, M.
    OPERATIONAL RESEARCH, 2018, 18 (01) : 123 - 158
  • [5] A bi-objective re-entrant permutation flow shop scheduling problem: minimizing the makespan and maximum tardiness
    Maedeh Fasihi
    Reza Tavakkoli-Moghaddam
    Fariborz Jolai
    Operational Research, 2023, 23
  • [6] A bi-objective re-entrant permutation flow shop scheduling problem: minimizing the makespan and maximum tardiness
    Fasihi, Maedeh
    Tavakkoli-Moghaddam, Reza
    Jolai, Fariborz
    OPERATIONAL RESEARCH, 2023, 23 (02)
  • [7] A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem
    Chen, Jen-Shiang
    Pan, Jason Chao-Hsien
    Lin, Chien-Min
    EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (01) : 570 - 577
  • [8] Integrating analytical hierarchy process to genetic algorithm for re-entrant flow shop scheduling problem
    Lin, Danping
    Lee, C. K. M.
    Wu, Zhang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (07) : 1813 - 1824
  • [9] Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraints
    Chamnanlor, Chettha
    Sethanan, Kanchana
    Gen, Mitsuo
    Chien, Chen-Fu
    JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (08) : 1915 - 1931
  • [10] Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraints
    Chettha Chamnanlor
    Kanchana Sethanan
    Mitsuo Gen
    Chen-Fu Chien
    Journal of Intelligent Manufacturing, 2017, 28 : 1915 - 1931