共 16 条
[1]
Brucker P(2004)Complexity results for flow-shop and open-shop scheduling problems with transportation delays Annals of Operations Research 129 81-106
[2]
Knust S(1979)Optimization and approximation in deterministic sequencing and scheduling: A survey Annals of Discrete Mathematics 5 287-326
[3]
Cheng TCE(1999)Two-machine open shop scheduling with special transportation times Journal of the Operational Research Society 50 756-764
[4]
Shakhlevich NV(1999)A heuristic for the two-machine open-shop scheduling problem with transportation times Discrete Applied Mathematics 93 287-304
[5]
Graham RL(2004)Minimizing makespan in a two-machine flow shop with delays and unit-time operations is np-hard Journal of Scheduling 7 333-348
[6]
Lawler EL(2010)On-line two-machine open shop scheduling with time lags European Journal of Operational Research 204 14-15
[7]
Lenstra JK(undefined)undefined undefined undefined undefined-undefined
[8]
Rinnooy Kan AHG(undefined)undefined undefined undefined undefined-undefined
[9]
Rebaine D(undefined)undefined undefined undefined undefined-undefined
[10]
Strusevich VA(undefined)undefined undefined undefined undefined-undefined