An Innovative Approach for Gob-Side Entry Retaining by Roof Cutting in Steeply Pitching Seam Longwall Mining with Hard Roof: a Case Study

被引:0
|
作者
Li Zhang
Jing Zhao
Chuanwei Zang
Shuanlin Wang
机构
[1] China University of Mining and Technology (Beijing),School of Energy and Mining Engineering
[2] China Coal Research Institute,Safety Branch
[3] State Key Laboratory of Coal Mining and Clean Utilization (China Coal Research Institute),College of Energy and Mining Engineering
[4] Shandong University of Science and Technology,undefined
来源
Mining, Metallurgy & Exploration | 2020年 / 37卷
关键词
Steeply pitching seam; Gob-side entry retaining (GER); Gob-side entry retaining by roof cutting (GERRC); Structural evolution;
D O I
暂无
中图分类号
学科分类号
摘要
The application of gob-side entry retaining (GER) in steeply pitching seam longwall mining with a hard roof has always been a difficult problem. Based on the simplified roof beam mechanical model, the traditional gob-side entry retaining by packing (GERP) roof structure evolution process and its problems with use in steeply pitching seams are analyzed. Therefore, based on the unique characteristics of the gangue rolling and accumulating in the steeply pitching seam, this contribution proposes an innovative method of gob-side entry retaining by roof cutting (GERRC) in steeply pitching seam and details its technical process. The roof structures of the GERRC and the GERP are compared. Taking the Chang Gouyu Coal Mine as a case study, field experiments were carried out. This research finds that the GERRC can both overcome the impact of rolling gangue on roadside support and make the rolling and stacking gangue become a roadside support. The roof structure of the GERRC is in a one-time statically indeterminate state, which is conducive to the stability of the roadway. In the field test, the total displacement of the roadway roof and floor is 97 mm, the supporting pressure of the serried single props is less than 28 MPa, and the props have no obvious bending phenomenon.
引用
收藏
页码:1079 / 1091
页数:12
相关论文
共 50 条
  • [1] An Innovative Approach for Gob-Side Entry Retaining by Roof Cutting in Steeply Pitching Seam Longwall Mining with Hard Roof: a Case Study
    Zhang, Li
    Zhao, Jing
    Zang, Chuanwei
    Wang, Shuanlin
    MINING METALLURGY & EXPLORATION, 2020, 37 (04) : 1079 - 1091
  • [2] Study of An Innovative Approach of Roof Presplitting for Gob-Side Entry Retaining in Longwall Coal Mining
    Zhang, Xingyu
    Chen, Liang
    Gao, Yubing
    Hu, Jinzhu
    Yang, Jun
    He, Manchao
    ENERGIES, 2019, 12 (17)
  • [3] An Innovative Approach for Gob-Side Entry Retaining With Thick and Hard Roof: A Case Study
    Zhang, Zizheng
    Wang, Weijun
    Li, Shuqing
    Bai, Jianbiao
    Hao, Shengpeng
    Wu, Hai
    Yu, Xianyang
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2018, 25 (04): : 1028 - 1036
  • [4] An Innovative Approach for Gob-Side Entry Retaining in Thick Coal Seam Longwall Mining
    He, Manchao
    Gao, Yubing
    Yang, Jun
    Gong, Weili
    ENERGIES, 2017, 10 (11):
  • [5] Key Parameters of Roof Cutting of Gob-Side Entry Retaining in a Deep Inclined Thick Coal Seam with Hard Roof
    Hu, Jinzhu
    He, Manchao
    Wang, Jiong
    Ma, Zimin
    Wang, Yajun
    Zhang, Xingyu
    ENERGIES, 2019, 12 (05):
  • [6] Fracture evolution of the main roof in gob-side entry retaining by roof cutting of an inclined coal seam
    Hu, Jinzhu
    Ma, Zimin
    Guo, Pengfei
    Hu, Yunjin
    ENERGY EXPLORATION & EXPLOITATION, 2023, 41 (04) : 1396 - 1414
  • [7] Study on the Application of Gob-Side Entry Retaining via Roof Cutting under the Condition of a Hard Thick Roof
    Zhu, Daoyong
    Zhang, Huyue
    Su, Yi
    GEOFLUIDS, 2022, 2022
  • [8] Study and Application of Gob-Side Entry Retaining Formed by Roof Cutting and Pressure Relief in Medium-Thickness Coal Seam with Hard Roof
    Xiaojie Yang
    Yue Sun
    Eryu Wang
    Wenbin Mao
    Geotechnical and Geological Engineering, 2020, 38 : 3709 - 3723
  • [9] Study and Application of Gob-Side Entry Retaining Formed by Roof Cutting and Pressure Relief in Medium-Thickness Coal Seam with Hard Roof
    Yang, Xiaojie
    Sun, Yue
    Wang, Eryu
    Mao, Wenbin
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2020, 38 (04) : 3709 - 3723
  • [10] Key Parameters of Gob-Side Entry Retaining in A Gassy and Thin Coal Seam with Hard Roof
    Yan, Shuai
    Liu, Tianxiao
    Bai, Jianbiao
    Wu, Wenda
    PROCESSES, 2018, 6 (05):