Economic lot-sizing problem with remanufacturing option: complexity and algorithms

被引:0
作者
Ashwin Arulselvan
Kerem Akartunalı
Wilco van den Heuvel
机构
[1] University of Strathclyde,Department of Management Science
[2] Erasmus University Rotterdam,Econometric Institute, Erasmus School of Economics
来源
Optimization Letters | 2022年 / 16卷
关键词
Lot-sizing; Remanufacturing; Complexity; Polynomial algorithms;
D O I
暂无
中图分类号
学科分类号
摘要
In a single item dynamic lot-sizing problem, we are given a time horizon and demand for a single item in every time period. The problem seeks a solution that determines how much to produce and carry at each time period, so that we will incur the least amount of production and inventory cost. When the remanufacturing option is included, the input comprises of number of returned products at each time period that can be potentially remanufactured to satisfy the demands, where remanufacturing and inventory costs are applicable. For this problem, we first show that it cannot have a fully polynomial time approximation scheme. We then provide a polynomial time algorithm, when we make certain realistic assumptions on the cost structure.
引用
收藏
页码:421 / 432
页数:11
相关论文
共 32 条
[1]  
Agrali S(2012)A dynamic uncapacitated lot-sizing problem with co-production Optim. Lett. 6 1051-1061
[2]  
Akartunalı K(2012)A computational analysis of lower bounds for big bucket production planning problems Comput. Optim. Appl. 53 729-753
[3]  
Miller A(2016)A computational comparison of formulations for the economic lot-sizing with remanufacturing Comput. Ind. Eng. 92 72-81
[4]  
Cunha JO(1971)Deterministic production planning with concave costs and capacity constraints Manag. Sci. 18 12-20
[5]  
Melo RA(1980)Deterministic production planning: algorithms and complexity Manag. Sci. 26 669-679
[6]  
Florian M(2001)Economic lot-sizing with remanufacturing options IIE Trans. 33 995-1003
[7]  
Klein M(2001)Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems Math. Oper. Res. 26 339-357
[8]  
Florian M(2019)Economic lot sizing with remanufacturing: Structural properties and polynomial-time heuristics IISE Trans. 51 1318-1331
[9]  
Lenstra J(2020)Economic lot sizing problem with inventory dependent demand Optim. Lett. 1 1-20
[10]  
Rinnooy-Kan H(2014)Economic lot-sizing with remanufacturing: complexity and efficient formulations IIE Trans. 46 67-86