共 53 条
[11]
Drexl A., Hartmann S., Sprecher A., An exact algorithm for project scheduling with multiple modes, OR Spektrum, 19, pp. 195-203, (1997)
[12]
Garey M.R., Johnson D.S., Computers and Intractability, (1979)
[13]
Grunow M., Gunther H.O., Lehmann M., Campaign planning for multi-stage batch processes in the chemical industry, OR Spectrum, 24, pp. 281-314, (2002)
[14]
Gunther H.O., (1999)
[15]
Heilmann R., Resource-constrained project scheduling: A heuristic for the multi-mode case, OR Spektrum, 23, pp. 335-357, (2001)
[16]
Holmberg K., Roennqvist M., Yuan D., An exact algorithm for the capacitated facility location problems with single sourcing, European Journal of Operational Research, 113, pp. 544-559, (1999)
[17]
Honkomp S.J., Lombardo S., Rosen O., Pekny J., The curse of reality - Why process scheduling optimization problems are difficult in practice, Computers & Chemical Engineering, 24, pp. 323-328, (2000)
[18]
Jayakumar S., Reklaitis G.V., Chemical plant layout via graph partitioning - I. single level, Computers & Chemical Engineering, 18, pp. 441-458, (1994)
[19]
Jayakumar S., Reklaitis G., Chemical plant layout via graph partitioning - II. multiple levels, Computers & Chemical Engineering, 20, pp. 563-578, (1996)
[20]
Kallrath J., Mixed-integer nonlinear programming applications, Operational Research in Industry, pp. 42-76, (1999)