Sequencing and scheduling of job and tool in a flexible manufacturing cell

被引:0
|
作者
T. Prabaharan
P.R. Nakkeeran
N. Jawahar
机构
[1] Mepco Engineering College Post,Department of Mechanical Engineering, Mepco Schlenk Engineering College
[2] Guindy,Department of Mechanical Engineering, College of Engineering
[3] Anna University,Department of Mechanical Engineering
[4] Thiagarajar College of Engineering,undefined
关键词
Schedule Problem; Completion Time; Simulated Annealing Algorithm; Work Centre; Total Processing Time;
D O I
暂无
中图分类号
学科分类号
摘要
Flexible manufacturing cells (FMCs) are now common place in many manufacturing companies, due to their numerous advantages such as the production of a wide range of part types with short lead times, low work-in-progress, economical production of small batches and high resource utilization. Part and tool flows, two major dynamic entities, are the key factors and their management plays an important role in the operation of a FMC. The theme of this paper is to a generate joint operation - tool schedule in a FMC consisting of several machines and a common tool magazine (CTM). To achieve this aim, the jobs and tools must be jointly sequenced and scheduled in a tool constrained environment. Two heuristic algorithms, priority dispatching rules algorithm (PDRA) and simulated annealing algorithm (SAA) are proposed to derive optimal solutions. PDRA, are the most frequently applied heuristics for solving job shop/combinatorial scheduling problems in practice because of their ease of implementation and their low complexity, when compared with excel algorithms. SAA that belong to search categories, which are emerging along with the high computational capability of computers, can be used for FMS scheduling problems. Both adopt the Giffler & Thompson procedure for active feasible schedule generation. The performance of these two algorithms is compared with makespan and computational time. The analysis reveals that the SAA based heuristic provides an optimal or near optimal solution with reasonable computational time.
引用
收藏
页码:729 / 745
页数:16
相关论文
共 50 条
  • [21] Optimum Scheduling of a Multi-Machine Flexible Manufacturing System Considering Job and Tool Transfer Times without Tool Delay
    Prayagi, Sunil
    Mareddy, Padma Lalitha
    Katta, Lakshmi Narasimhamu
    Narapureddy, Sivarami Reddy
    MATHEMATICS, 2023, 11 (19)
  • [22] Adaptive scheduling and tool flow control in flexible job shops
    Chen, Jie
    Chen, F. Frank
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (15) : 4035 - 4059
  • [23] An integrated approach to solve tool-part grouping, job allocation and scheduling problems in a flexible manufacturing system
    Goswami, Mohit
    Tiwari, M. K.
    Mukhopadhyay, S. K.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 35 (11-12): : 1145 - 1155
  • [24] An integrated approach to solve tool-part grouping, job allocation and scheduling problems in a flexible manufacturing system
    Mohit Goswami
    M. K. Tiwari
    S. K. Mukhopadhyay
    The International Journal of Advanced Manufacturing Technology, 2008, 35 : 1145 - 1155
  • [25] Modeling the Integrated Flexible Job-Shop and Operator Scheduling in Flexible Manufacturing Systems
    Saber, Reza Ghorbani
    Leyman, Pieter
    Aghezzaf, El-Houssaine
    IFAC PAPERSONLINE, 2024, 58 (19): : 343 - 348
  • [26] A INTELLIGENT SCHEDULING SYSTEM FOR FLEXIBLE MANUFACTURING CELL
    SHI, HB
    XUE, JS
    IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 3 : 721 - 728
  • [27] Solving flexible job shop scheduling problems in manufacturing with Quantum Annealing
    Schworm, Philipp
    Wu, Xiangqian
    Glatt, Moritz
    Aurich, Jan C.
    PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2023, 17 (01): : 105 - 115
  • [28] Flexible Job-Shop Scheduling for Reduced Manufacturing Carbon Footprint
    Liu, Qiong
    Tian, Youquan
    Wang, Chao
    Chekem, Freddy O.
    Sutherland, John W.
    JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2018, 140 (06):
  • [29] Flexible Job Shop Scheduling With Operators in Aeronautical Manufacturing: A Case Study
    Borreguero-Sanchidrian, Tamara
    Pulido, Raul
    Garcia-Sanchez, Alvaro
    Ortega-Mier, Miguel
    IEEE ACCESS, 2018, 6 : 224 - 233
  • [30] Multiobjective flexible job-shop scheduling optimization for manufacturing servitization
    Wang, Wei
    Zhang, Jian
    Jia, Yanhe
    INTERNATIONAL JOURNAL OF WEB INFORMATION SYSTEMS, 2024, 20 (04) : 374 - 394